HomeMy WebLinkAbout0127886-Plumbing (water heater)
G CITY OF OSHKOSH No 127886
OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 1630 COVINGTON DR Owner ANDREW C BALOG/LISA GERL Create Date 11/19/2007
Contractor SAMMONS PLUMBING
Category ~1}-=_'3IO~idential-Wa.~e!_HeCltE3rsu _ Plan
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature
of Work
Shower Water Softner Wait. St. Shamp Sink
Floor Drain Local Waste Ice Chest Flr/Wst Sink
Lndry Tray Clothes Wshr Exam Sink Catch Basin
Disposal Bidet Sculry Sink Wash Ftn
Dishwasher Beer Tap Hand Sink Urinal
Sump Pump Lab Sink Plaster Sink Standp Rec
Classrm Sink Sterilizer Surgeons Sink Ice Maker
Breakrm Sink Dip Well F Prep Sink Gar Drain
Ejector/Grind Drink Ftn Serv Sink Soda Disp
SFR IRepTilce gas-walerhealer:--**DEBIT AC'CT**.
1
I
I
i
I
L-
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Valuation
Issued By
Size
Material
Type
#
Conn. Type
$700.00 Plan Approval
--------fbno
_____ $O.QQ
$25.00 0 Permit Voided I
_~__________ ______._______1
Parcelld #
1317110000
Permit Fees
Date 11/19/2007
Sanitary Sewer
Storm Sewer
Water Service
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 522 WMURDOCK AVE OSHKQ~!j___ __ WI ~~~O~_u - ~2~8 __ Telephone Number 231~9880
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
Ii