HomeMy WebLinkAboutPlumbing H7-11-296-P
CITY HALL
215 Church Avenue
P. O. Box 1130
Oshkosh. Wisconsin
54902-1130
City of Oshkosh
~
OJHKOJH
March 7, 1996
Rick Schroeder, AlA
651 Franklin Street
Oshkosh, WI 54901
RE: Siena Transitional Living Center
471 High Avenue
H7-11-296-P
Gentlemen:
Examination of the plumbing plans and specifications for the
abovementioned project has been completed.
In accord with Chapter 145, Wisconsin Statutes, and ILHR 81 through 85,
Wisconsin Administrative Code, the plumbing plans and specifications are
approved contingent upon compliance with the stipulation noted below:
1) ILHR 82.41 Cross connection control
2) ILHR 82.40 Control valves
3) ILHR 82.31 Vent grades and connections
4) ILHR 82.35 Clean outs
The architect, professional engineer, registered designer, owner or
plumbing contractor shall keep, at the con.struction site, one set of
/ plans bearing the stamp of approval.
In the event installation of this plumbing system has not commenced
within two years from this date, this approval shall become void. A new
application accompanied by full examination fee shall be filed and an
updated received before work may commence.
In granting this approval, the City of Oshkosh or its representative does
not hold itself liable for any defects in plans of specification, plan
omissions, examination oversight, construct.ion or any damage that may
result in or after installation and reserveS the right to order changes
I
or additions should conditions arise making this necessary.
It shall be necessary for installing plumber to obtain a plumbing permit
from the City of Oshkosh before proceeding with actual installation of
this plumbing system or any of its parts.
!!-,in7rely, r-
U~r-' ~
w~ CALLIES
Plumbing Inspector