Loading...
HomeMy WebLinkAbout2007-Plumbing (water heater) e OSHKOSH ON THE WATER Job Address 911 WISCONSIN ST Contractor MOREMAN PLBG & HTG SERVICE INC Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work CITY OF OSHKOSH No 127853 PLUMBING PERMIT - APPLICATION AND RECORD Owner DELTA CHI FRAT INC Create Date 11/15/2007 Category 411 - Residential-Water Heaters Plan Shower Water Softner Wait. St. Floor Drain Local Waste Ice Chest Lndry Tray Clothes Wshr Exam Sink Disposal Bidet Sculry Sink Dishwasher Beer Tap Hand Sink Sump Pump Lab Sink Plaster Sink Classrm Sink Sterilizer Surgeons Sink Breakrm Sink Dip Well F Prep Sink Ejector/Grind Drink Ftn Serv Sink Shamp Sink Flr/Wst Sink Catch Basin Wash Ftn Urinal Standp Rec Ice Maker Gar Drain Soda Disp Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs -------------1 I I ! ISFR / REPLACE GAS WATER HEATER **debfacci--- I i I I Size Material Sanitary Sewer Storm Sewer Water Service Type # Conn. Type Valuation $650.00 Plan Approval Issued By ?5Yn& Parcelld # 0502070000 $0.00 Permit Fees ___~.OO 0 Permit Voided J Date 11/15/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address PO BOX 1325 OSHKOSH WI 54903 - 1325 Telephone Number (920) 231-9191 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.