Loading...
HomeMy WebLinkAbout2007-Building (sprinkler system) e CITY OF OSHKOSH No 127818 OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 3001 S WASHBURN ST Owner BFO FACTORY SHOPPES LLC Create Date 11/14/2007 Designer Tracy Erke Contractor AHERN FIRE PROTECTION Category 232 - Alteration Stores & Customer Service Plan Z4-2066-0807 Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq.Ft. Sq.Ft. Sq.Ft. Rooms Height Ft. D Projection I Canopies Finished/Living Bedrooms Stories Signs Garage Baths Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units o # Structures o Use/Nature Space C 030 / "Journey's" - Alterations of automatic fire sprinkler system as per plans of Work HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $8,000.00 Plan Approval $0.00 Permit Fee Paid $74.00 Park Dedication $0.00 Issued By: Date 11/14/2007 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1329420000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 201 Morris Court Fond du Lac WI 54936 - 0000 Telephone Number 920-921-9020 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.