HomeMy WebLinkAbout0127828-Plumbing (laterals)
e
OSHKOSH
ON THE WATER
Job Address 1214 POWERS ST
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner THOMAS L/KARIN L JESKE
Contractor BERNDT EXCAVATING
Category 401 - Residential-Exterior (laterals)
Bathtub Shower Water Softner Wait. St. Shamp Sink
Whirlpool Floor Drain Local Waste Ice Chest FlrlWst Sink
Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin
Toilet Disposal Bidet Sculry Sink Wash Ftn
Res. Sink Dishwasher Beer Tap Hand Sink Urinal
Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec
Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker
Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain
Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp
Misc.
Fixtures
Use/Nature fristall-ri-ew 1-1/4" water lateral.
of Work
L
No 127828
Create Date 11/14/2007
Plan
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Size
#
Conn. Type
___J
Material
Type
Sanitary Sewer
Storm Sewer
Water Service
1-1/4 "
Lateral
Relay
Plastic
Valuation $1,200.00 Plan Approval ___~-,QQ Permit Fees ____~Q:2Q lli<:~Ill~t~<:>.i~~_dJ
Issued By ~
Parcelld #
1508360000
Date 11/14/2007
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
e~sement hO~j;:.~::JL;r. re any n~ry app~~~~restarting such activity.
Signature' t ~
Agent/Owner
Date
/1- /4 '-O?
Address 2527 W WAUKAU AVE
- -- - -.-.-
OSHKOSH
.---. - --
WI 54904 - 0000 Telephone Number 235-3331
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.