Loading...
HomeMy WebLinkAbout0127828-Plumbing (laterals) e OSHKOSH ON THE WATER Job Address 1214 POWERS ST CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner THOMAS L/KARIN L JESKE Contractor BERNDT EXCAVATING Category 401 - Residential-Exterior (laterals) Bathtub Shower Water Softner Wait. St. Shamp Sink Whirlpool Floor Drain Local Waste Ice Chest FlrlWst Sink Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin Toilet Disposal Bidet Sculry Sink Wash Ftn Res. Sink Dishwasher Beer Tap Hand Sink Urinal Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp Misc. Fixtures Use/Nature fristall-ri-ew 1-1/4" water lateral. of Work L No 127828 Create Date 11/14/2007 Plan Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Size # Conn. Type ___J Material Type Sanitary Sewer Storm Sewer Water Service 1-1/4 " Lateral Relay Plastic Valuation $1,200.00 Plan Approval ___~-,QQ Permit Fees ____~Q:2Q lli<:~Ill~t~<:>.i~~_dJ Issued By ~ Parcelld # 1508360000 Date 11/14/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the e~sement hO~j;:.~::JL;r. re any n~ry app~~~~restarting such activity. Signature' t ~ Agent/Owner Date /1- /4 '-O? Address 2527 W WAUKAU AVE - -- - -.-.- OSHKOSH .---. - -- WI 54904 - 0000 Telephone Number 235-3331 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.