HomeMy WebLinkAboutAhern (Fire Protecthion System Installation) 10/15/07
/',.~
J. F. A.HERN Co.
MECHANICAL & FIRE
PROTECTION CONTRACTORS
201 Morris Court, P.O. Box 1316
Fond du Lac, WI 54936-1316
(920) 921-9020 P · (920) 921-86~f
www.jfahern.com
October 15, 2007
Building Inspector -- Brian Noe
City of Oshkosh
215 Church Avenue -- PO Box 1130
Oshkosh, WI 54901
T -920/236-5051
F-920/236-1130
RE: FIRE PROTECTION SYSTEM INSTALLATION
CHAMCO
2800 NORTH MAIN STREET
OSHKOSH, WISCONSIN 54901
AHERN FIRE PROTECTION CONTRACT No. 490622
Dear Brian:
Enclosed is a copy ofthe Contractor's Material and Test Certificates covering the above-referenced
Fire Protection System Installation for your files.
Very truly yours,
AHERN FIRE PROTECTION
A division of J. F. Ahern Co.
~!lJ.$~
Mark L. Jozefowski, Superintendent
MLJ/ksj
Enclosure
LCITYl 0-15-2007 DOC
R
~,
\f~
;~M
OCT 1 6 2007
DEPARTIVltNT OF
COMMUNITY DEVELOPMENT
INSPECTION SERVICES DIVISION
Building the Midwest Since 1880
An Equal Opportunity Employer
;-
AHERN FIRE PROTECTION
Contractor's Material and Test Certificate for Aboveground Piping
PROCEDURE
Upon completion of work, inspection and tests shall be made by the contractor's representative and witnessed by an owner's representative. All defects shall be
corrected and system left in service before contractor's personnel finally leave the job. .
A certificate shall be filled out and signed by both representatives. Copies shall be prepared for approving authorities. owners, and contractor. It is understood the
owner's representative's signature in no way prejudices any claim against contractor for faulty material. poor workmanship. or failure to comply with approving
authority's reauirements or local ordinances.
PROPERTY NAME Chamcq AFP Contract #: 490622 I DATE: September 25, 2007
PROPERTY ADDRESS 2800 North Main Street Oshkosh, WI 54901
ACCEPTED BY APPROVING AUTHORITIES (NAMES)
1. Oshkosh Fire Department (Battalion Chief -- Stu Schrottky)
2. City of Oshkosh (Building Inspector -- Brian Noe)
3.
4.
ADDRESS
Plans 1. 101 Court Street -- Oshkosh, WI 54901
2. 215 Church Avenue -- PO Box 1130 - Oshkosh, WI 54901
3.
4.
INSTALLATION CONFORMS TO ACCEPTED PLANS ~YES DNO
EQUIPMENT USED IS APPROVED . YES DNO
IF NO, EXPLAIN DEVIATIONS
HAS PERSON IN CHARGE OF FIRE EQUIPMENT BEEN INSTRUCTED AS TO LOCATION ijl YES DNO
OF CONTROL VALVES AND CARE AND MAINTENANCE OF THIS NEWEQUIPMENT?
INSTRUCTIONS IF NO, EXPLAIN
HAVE COPIES OF THE FOLLOWING BEEN LEFT ON THE PREMISES:
Item No.'s 2 & 3 will 1. SYSTEM COMPONENTS INSTRUCTION -m YES DNO
be forwarded by AFP 2. CARE AND MAINTENANCE INSTRUCTIONS iZ9. YES DNO
at closeout time.
3. NFPA 25 [JtYES DNO
LOCATION OF SUPPLIES BUILDINGS ( PY'Cl~~ ~ g)
SYSTEM System #2 - Remote Area 1 (Revised)
MAKE MODEL YEAR OF K- QUANTITY TEMPERATURE
MANUFACTURE FACTOR RATING
Viking Micromatic M VK200 Upright 3/4" Brass 2007 8.0 384 286 Dec.
Viking Microfast M QR VK606 HSW 3/4" Brass 2007 8.0 2 175 DeQ.
SPRINKLERS
PIPE AND TYPE OF PIPE LiQhtwall Non- Tnreadable: Thinwall Threadable: Black
FITTINGS TYPE OF FITTINGS Grooved: Threaded: Welded Outlets: Mechanical Tees
FLOW ALARM DEVICE MAXIMUM TIME TO OPERATE
THROUGH TEST CONNECTION
TYPE MAKE MODEL MIN. SEC.
Water Flow Detector System Sensor WFD ., l-r~
N/A
EXPLAIN ANY ALARM PROBLEMS:
ALARM
DEVICES LOW AIR ALARM DEVICE I ALARM OPERATED
TYPE I MAKE I MODEL I PRESSURE PROPERLY
~ SETTING PSI I
N/A ~""'v.:". YES NO
n 1-1 nl
EXPLAIN ANY ALARM PROBLEMS: -"'<l'!'llru!llJ" ~
OCT 1 6 2007
....,........~_. I'" ,..,,...
~
COMMUNITY DEVELOPMENT
INSPECTION SERVICES DIVISION
Ahern Ire ro
CENTRAL MONITORING SIGNALS RECEIVED
LOCATION(S) PRESSURE
ALARM SERVICE OR WATERFLOW LOW-AIR OTHER
TYPE NAME OF REMOTE SWITCH SUPERVISORY
SERVICE DETECTOR FLOW
SUPERVISING LOCATION(S):
STATION
(ON-SITE) .. fL
7
- "-
REMOTE NAME OF SERVICE: \\ '\ o ' ~O')
REMOTE MONITORING \\ ' [,
ALARM SERVICE '\\) ~
SIGNALING (OFF-SITE)
PHONE:
OTHER: LOCATION(S):
EXPLAIN ANY ALARM SIGNALING PROBLEMS:
DRY VALVE Q.O.D.
MODEL SERIAL NO. MAKE MODEL SERIAL NO.
MAKE
TIME WATER ALARM
TIME TO TRIP WATER AIR PRESSURE TRIP POINT AIR REACHED TEST OPERATED
THROUGH TEST PRESSURE PRESSURE OUTLET 1.2 PROPERLY
CONNECTION'.2
DRY PIPE MIN. SEC. PSI PSI PSI MIN. SEC. YES NO
OPERATING WITHOUT
TEST Q.O.D.
WITH
Q.O.o.
IF NO, EXPLAIN:
OPERATION: o PNEUMATIC o ELECTRIC o HYDRAULIC
PIPING SUPERVISED DYES DNO DETECTING MEDIA SUPERVISED DYES DNO
DOES VALVE OPERATE FROM THE MANUAL TRIP, REMOTE, OR BOTH CONTROL STATIONS DYES DNO
IS THERE AN ACCESSIBLE FACILITY IN EACH IF NO, EXPLAIN
DELUGE & CIRCUIT FOR TESTING
PREACTlON DYES DNO
VALVES
DOES EACH CIRCUIT DOES EACH CIRCUIT
I.. OPERATE SUPERVISION MAXIMUM TIME TO
MAKE MODEL LOSS ALARM OPERATE VALVE RELEASE OPERATE RELEASE
YES NO YES NO
MIN. SEC.
LOCATION & MAKE & MODEL
PRESSURE FLOOR SETTING STATIC PRESSURE RESIDUAL PRESSURE
REDUCING INLET (FLOWING) FLOW RATE
VALVE TEST OUTLET INLET OUTLET
(PSI) (PSI) (PSI) FLOW
(PSI) (GPM)
F" P tection
; MEASURED FROM TIME INSP - .
NFPA 13 ONLY REQUIRES TH~~6~~~b~ST CONNECTION IS OPENED,
o LIMITATION IN SPECIFIC SECTIONS.
II
--========-- '"
2
-----
TEST
DESCRIPTION
P ,J C7/\
la~+ 1#~eG5
TESTS
BLANK
TESTING
GASKETS
WELDING
CUTOUTS
DISCS)
HYDRAULIC
DATA
NAMEPLATE
REMARKS
SIGNATURES
Ahern Fire Protection
HYDROSTATIC: Hydrostatic tests shall be made at not less than 200 psi (13,6 bars) for two hours or 50 psi (3-4 bars) above static pressure in
excess of 150 psi (10,2 bars) for two hours. Differential dry-pipe valve Clappers shall be left open during test to prevent damage. All
aboveground piping leakage shall be stopped,
PNEUMATIC: Establish 40-psi (2.7 bars) air pressure and measure drop, which shall not exceed 1-1/2 psi (0.1 bars) in 24 hours. Test
pressure tanks at normal water level and air pressure and measure air pressure drop, which shall not exceed 1-1/2 psi (0.1 bars) in 24 hours.
ALL PIPING HYDROSTATICALLY TESTED AT~ PSI <--Bar) for -2- HRS. IF NO,STATE REASON
DRY PIPING PNEUMATICALLY TESTED 0 YES 0 NO
EQUIPMENT OPERATES PROPERLY ~ YES 0 NO
DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT ADDITIVES AND CORROSIVE CHEMICALS, SODIUM
SILICATE OR DERIVATIVES OR SODIUM SILICATE, BRINE, OR OTHER CORROSIVE CHEMICALS WERE NOT USED
FOR TESTING SYSTEMS OR STOPPING LEAKS?
YES 0 NO
DRAIN READING OF GAUGE LOCATED NEAR WATER RESIDUAL PRESSURE WITH VALVE IN TEST
TEST SUPPLY TEST CONNECTION:_ PSI ( Bar) CONNECTION OPEN WIDE: _ PSI LBar)
UNDERGROUND MAINS AND LEAD IN CONNECTIONS TO SYSTEM RISER OTHER EXPLAIN
FLUSHED BEFORE CONNECTION MADE TO SPRINKLER PIPING.
VERIFIED BY COPY OF THE CONTRACTOR'S MATERIAL AND TEST
CERTIFICATE FOR UNDERGROUND PIPING. 0 YES 0 NO
FLUSHED BY INSTALLER OF UNDERGROUND SPRINKLER PIPING 0 YES 0 NO
f:-/,s/~r75
IF POWDER-DRIVEN FASTENERS ARE USED IN CONCRETE, HAS IF NO, EXPLAIN
REPRESENTATIVE SAMPLE TESTING BEEN SATISFACTORILY COMPLETED?
DYES 0 NO
NUMBER USED
LOCATIONS
WELDED PIPING
YES 0 NO
IF YES...
DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT WELDING
PROCEDURES COMPLY WITH THE REQUIREMENTS OF AT LEAST AWS B2.1?
NUMBER REMOVED
[]I. YES
ONO
"~. .... .
DOYOU CERi'iFYTHAT THE WELDING WAS PERFORMED BY WELDERSq YES
QUALIFIED IN COMPLIANCE WITH THE REQUIREMENTS OF AT LEAST AWS B2.1?
DO YOU CERTIFY THAT WELDING WAS CARRIED OUT IN COMPLIANCE WITH A
DOCUMENTED QUALITY CONTROL PROCEDURE TO ENSURE THAT ALL DISCS
ARE RETRIEVED, THAT OPENINGS IN PIPING ARE SMOOTH, THAT SLAG AND
OTHER WELDING RESIDUE ARE REMOVED, AND THAT THE INTERNAL
DIAMETERS OF PIPING ARE NOT PENETRATED?
DO YOU CERTIFY THAT YOU HAVE A CONTROL FEATURE TO ENSURE THAT ALL
CUTOUTS (DISCS) ARE RETRIEVED?
NAME PLATE PROVIDED
~ YES 0 NO
DATE LEFT IN SERVICE WITH ALL CONTROL VALVES OPEN:
NAME OF SPRINKLER CONTRACTOR
AHERN FIRE PROTECTION, 201 MORRIS COURT FOND DU LAC, WI 54935
TESTS WITNESSED BY
VIN J' RISDICTION (SIGNED) ,.-,-- TITLE .(
+v\ ect2..A
TITLE
')
ONO
~YES
ONO
5] YES 0 NO
IF NO, EXPLAIN
4-