Loading...
HomeMy WebLinkAboutAhern (Fire Protecthion System Installation) 10/15/07 /',.~ J. F. A.HERN Co. MECHANICAL & FIRE PROTECTION CONTRACTORS 201 Morris Court, P.O. Box 1316 Fond du Lac, WI 54936-1316 (920) 921-9020 P · (920) 921-86~f www.jfahern.com October 15, 2007 Building Inspector -- Brian Noe City of Oshkosh 215 Church Avenue -- PO Box 1130 Oshkosh, WI 54901 T -920/236-5051 F-920/236-1130 RE: FIRE PROTECTION SYSTEM INSTALLATION CHAMCO 2800 NORTH MAIN STREET OSHKOSH, WISCONSIN 54901 AHERN FIRE PROTECTION CONTRACT No. 490622 Dear Brian: Enclosed is a copy ofthe Contractor's Material and Test Certificates covering the above-referenced Fire Protection System Installation for your files. Very truly yours, AHERN FIRE PROTECTION A division of J. F. Ahern Co. ~!lJ.$~ Mark L. Jozefowski, Superintendent MLJ/ksj Enclosure LCITYl 0-15-2007 DOC R ~, \f~ ;~M OCT 1 6 2007 DEPARTIVltNT OF COMMUNITY DEVELOPMENT INSPECTION SERVICES DIVISION Building the Midwest Since 1880 An Equal Opportunity Employer ;- AHERN FIRE PROTECTION Contractor's Material and Test Certificate for Aboveground Piping PROCEDURE Upon completion of work, inspection and tests shall be made by the contractor's representative and witnessed by an owner's representative. All defects shall be corrected and system left in service before contractor's personnel finally leave the job. . A certificate shall be filled out and signed by both representatives. Copies shall be prepared for approving authorities. owners, and contractor. It is understood the owner's representative's signature in no way prejudices any claim against contractor for faulty material. poor workmanship. or failure to comply with approving authority's reauirements or local ordinances. PROPERTY NAME Chamcq AFP Contract #: 490622 I DATE: September 25, 2007 PROPERTY ADDRESS 2800 North Main Street Oshkosh, WI 54901 ACCEPTED BY APPROVING AUTHORITIES (NAMES) 1. Oshkosh Fire Department (Battalion Chief -- Stu Schrottky) 2. City of Oshkosh (Building Inspector -- Brian Noe) 3. 4. ADDRESS Plans 1. 101 Court Street -- Oshkosh, WI 54901 2. 215 Church Avenue -- PO Box 1130 - Oshkosh, WI 54901 3. 4. INSTALLATION CONFORMS TO ACCEPTED PLANS ~YES DNO EQUIPMENT USED IS APPROVED . YES DNO IF NO, EXPLAIN DEVIATIONS HAS PERSON IN CHARGE OF FIRE EQUIPMENT BEEN INSTRUCTED AS TO LOCATION ijl YES DNO OF CONTROL VALVES AND CARE AND MAINTENANCE OF THIS NEWEQUIPMENT? INSTRUCTIONS IF NO, EXPLAIN HAVE COPIES OF THE FOLLOWING BEEN LEFT ON THE PREMISES: Item No.'s 2 & 3 will 1. SYSTEM COMPONENTS INSTRUCTION -m YES DNO be forwarded by AFP 2. CARE AND MAINTENANCE INSTRUCTIONS iZ9. YES DNO at closeout time. 3. NFPA 25 [JtYES DNO LOCATION OF SUPPLIES BUILDINGS ( PY'Cl~~ ~ g) SYSTEM System #2 - Remote Area 1 (Revised) MAKE MODEL YEAR OF K- QUANTITY TEMPERATURE MANUFACTURE FACTOR RATING Viking Micromatic M VK200 Upright 3/4" Brass 2007 8.0 384 286 Dec. Viking Microfast M QR VK606 HSW 3/4" Brass 2007 8.0 2 175 DeQ. SPRINKLERS PIPE AND TYPE OF PIPE LiQhtwall Non- Tnreadable: Thinwall Threadable: Black FITTINGS TYPE OF FITTINGS Grooved: Threaded: Welded Outlets: Mechanical Tees FLOW ALARM DEVICE MAXIMUM TIME TO OPERATE THROUGH TEST CONNECTION TYPE MAKE MODEL MIN. SEC. Water Flow Detector System Sensor WFD ., l-r~ N/A EXPLAIN ANY ALARM PROBLEMS: ALARM DEVICES LOW AIR ALARM DEVICE I ALARM OPERATED TYPE I MAKE I MODEL I PRESSURE PROPERLY ~ SETTING PSI I N/A ~""'v.:". YES NO n 1-1 nl EXPLAIN ANY ALARM PROBLEMS: -"'<l'!'llru!llJ" ~ OCT 1 6 2007 ....,........~_. I'" ,..,,... ~ COMMUNITY DEVELOPMENT INSPECTION SERVICES DIVISION Ahern Ire ro CENTRAL MONITORING SIGNALS RECEIVED LOCATION(S) PRESSURE ALARM SERVICE OR WATERFLOW LOW-AIR OTHER TYPE NAME OF REMOTE SWITCH SUPERVISORY SERVICE DETECTOR FLOW SUPERVISING LOCATION(S): STATION (ON-SITE) .. fL 7 - "- REMOTE NAME OF SERVICE: \\ '\ o ' ~O') REMOTE MONITORING \\ ' [, ALARM SERVICE '\\) ~ SIGNALING (OFF-SITE) PHONE: OTHER: LOCATION(S): EXPLAIN ANY ALARM SIGNALING PROBLEMS: DRY VALVE Q.O.D. MODEL SERIAL NO. MAKE MODEL SERIAL NO. MAKE TIME WATER ALARM TIME TO TRIP WATER AIR PRESSURE TRIP POINT AIR REACHED TEST OPERATED THROUGH TEST PRESSURE PRESSURE OUTLET 1.2 PROPERLY CONNECTION'.2 DRY PIPE MIN. SEC. PSI PSI PSI MIN. SEC. YES NO OPERATING WITHOUT TEST Q.O.D. WITH Q.O.o. IF NO, EXPLAIN: OPERATION: o PNEUMATIC o ELECTRIC o HYDRAULIC PIPING SUPERVISED DYES DNO DETECTING MEDIA SUPERVISED DYES DNO DOES VALVE OPERATE FROM THE MANUAL TRIP, REMOTE, OR BOTH CONTROL STATIONS DYES DNO IS THERE AN ACCESSIBLE FACILITY IN EACH IF NO, EXPLAIN DELUGE & CIRCUIT FOR TESTING PREACTlON DYES DNO VALVES DOES EACH CIRCUIT DOES EACH CIRCUIT I.. OPERATE SUPERVISION MAXIMUM TIME TO MAKE MODEL LOSS ALARM OPERATE VALVE RELEASE OPERATE RELEASE YES NO YES NO MIN. SEC. LOCATION & MAKE & MODEL PRESSURE FLOOR SETTING STATIC PRESSURE RESIDUAL PRESSURE REDUCING INLET (FLOWING) FLOW RATE VALVE TEST OUTLET INLET OUTLET (PSI) (PSI) (PSI) FLOW (PSI) (GPM) F" P tection ; MEASURED FROM TIME INSP - . NFPA 13 ONLY REQUIRES TH~~6~~~b~ST CONNECTION IS OPENED, o LIMITATION IN SPECIFIC SECTIONS. II --========-- '" 2 ----- TEST DESCRIPTION P ,J C7/\ la~+ 1#~eG5 TESTS BLANK TESTING GASKETS WELDING CUTOUTS DISCS) HYDRAULIC DATA NAMEPLATE REMARKS SIGNATURES Ahern Fire Protection HYDROSTATIC: Hydrostatic tests shall be made at not less than 200 psi (13,6 bars) for two hours or 50 psi (3-4 bars) above static pressure in excess of 150 psi (10,2 bars) for two hours. Differential dry-pipe valve Clappers shall be left open during test to prevent damage. All aboveground piping leakage shall be stopped, PNEUMATIC: Establish 40-psi (2.7 bars) air pressure and measure drop, which shall not exceed 1-1/2 psi (0.1 bars) in 24 hours. Test pressure tanks at normal water level and air pressure and measure air pressure drop, which shall not exceed 1-1/2 psi (0.1 bars) in 24 hours. ALL PIPING HYDROSTATICALLY TESTED AT~ PSI <--Bar) for -2- HRS. IF NO,STATE REASON DRY PIPING PNEUMATICALLY TESTED 0 YES 0 NO EQUIPMENT OPERATES PROPERLY ~ YES 0 NO DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT ADDITIVES AND CORROSIVE CHEMICALS, SODIUM SILICATE OR DERIVATIVES OR SODIUM SILICATE, BRINE, OR OTHER CORROSIVE CHEMICALS WERE NOT USED FOR TESTING SYSTEMS OR STOPPING LEAKS? YES 0 NO DRAIN READING OF GAUGE LOCATED NEAR WATER RESIDUAL PRESSURE WITH VALVE IN TEST TEST SUPPLY TEST CONNECTION:_ PSI ( Bar) CONNECTION OPEN WIDE: _ PSI LBar) UNDERGROUND MAINS AND LEAD IN CONNECTIONS TO SYSTEM RISER OTHER EXPLAIN FLUSHED BEFORE CONNECTION MADE TO SPRINKLER PIPING. VERIFIED BY COPY OF THE CONTRACTOR'S MATERIAL AND TEST CERTIFICATE FOR UNDERGROUND PIPING. 0 YES 0 NO FLUSHED BY INSTALLER OF UNDERGROUND SPRINKLER PIPING 0 YES 0 NO f:-/,s/~r75 IF POWDER-DRIVEN FASTENERS ARE USED IN CONCRETE, HAS IF NO, EXPLAIN REPRESENTATIVE SAMPLE TESTING BEEN SATISFACTORILY COMPLETED? DYES 0 NO NUMBER USED LOCATIONS WELDED PIPING YES 0 NO IF YES... DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT WELDING PROCEDURES COMPLY WITH THE REQUIREMENTS OF AT LEAST AWS B2.1? NUMBER REMOVED []I. YES ONO "~. .... . DOYOU CERi'iFYTHAT THE WELDING WAS PERFORMED BY WELDERSq YES QUALIFIED IN COMPLIANCE WITH THE REQUIREMENTS OF AT LEAST AWS B2.1? DO YOU CERTIFY THAT WELDING WAS CARRIED OUT IN COMPLIANCE WITH A DOCUMENTED QUALITY CONTROL PROCEDURE TO ENSURE THAT ALL DISCS ARE RETRIEVED, THAT OPENINGS IN PIPING ARE SMOOTH, THAT SLAG AND OTHER WELDING RESIDUE ARE REMOVED, AND THAT THE INTERNAL DIAMETERS OF PIPING ARE NOT PENETRATED? DO YOU CERTIFY THAT YOU HAVE A CONTROL FEATURE TO ENSURE THAT ALL CUTOUTS (DISCS) ARE RETRIEVED? NAME PLATE PROVIDED ~ YES 0 NO DATE LEFT IN SERVICE WITH ALL CONTROL VALVES OPEN: NAME OF SPRINKLER CONTRACTOR AHERN FIRE PROTECTION, 201 MORRIS COURT FOND DU LAC, WI 54935 TESTS WITNESSED BY VIN J' RISDICTION (SIGNED) ,.-,-- TITLE .( +v\ ect2..A TITLE ') ONO ~YES ONO 5] YES 0 NO IF NO, EXPLAIN 4- DATE