HomeMy WebLinkAbout07-326 NOVEMBER 13, 2007 07 -326 RESOLUTION (CARRIED 6-0 LOST LAID OVER WITHDRAWN PURPOSE: APPROVE AMENDMENT NO.2 TO AGREEMENT FOR PLANNING/ENGINEERING SERVICES/SAWYER CREEK REGIONAL DETENTION BASIN ($29,500.00) INITIATED BY: PUBLIC WORKS DEPARTMENT BE IT RESOLVED by the Common Council of the City of Oshkosh that the attached Amendment No. 2 to Agreement for Planning Services for Sawyer Creek Regional Detention Basin Plan with an increase of $29,500.00 is hereby approved and the proper City officials are hereby authorized to execute and deliver the agreement in substantially the same form as attached hereto, any changes in the execution copy being deemed approved by their respective signatures, and said City officials are authorized and directed to take those steps necessary to implement the terms and conditions of the Agreement. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No. 561-2010-1799-00000 - Storm Water Utility - Construction in Progress " STRAND ASSOCIATes. INC.. ENGINEERS 910 West Wingra Drive Madison. WI 53715 Phone: 608-251-4843 Fax: 608-251-8655 Office Locations Madison, WI Joliet,lL Louisville. KY Lexington. KY Mobile. AL Columbus, IN Columbus, OH Indianapolis, IN Milwaukee. WI Cincinnati. OH www.strand.com October 1 0, 2007 ,City of Oshkosh 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 Attention: David Patek, P.E., Director of Public Works Re: Agreement for Planning Services-Amendment No.2 Sawyer Creek Regional Detention Basin Plan This is Amendment No. 2 to the referenced Agreement for Planning Services dated August 19,2005. Under Scope of Services: Item D. Hydraulic Modeling, ADD the following sentence: "Incorporate the recommended alternative Sawyer Creek, outfall hydrographs from the final, Campbell Creek Stormwater Plan into the HEC-RAS model for Sawyer Creek." Item E. Alternatives Analysis, DELETE 1 through 7 and replace with the following: "1. Alternative I-One regional detention basin near the James Road/HWY 91 intersection under existing conditions. A preliminary grading plan and outlet structure configuration for this detention basin will be provided based on existing 2- foot contours provided by OWNER. 2. Alternative 2-0ne regional detention basin within the city limits under existing conditions. A preliminary grading plan and outlet structUre configuration for this detention basin will be provided based on existing 2-foot contours provided by OWNER. 3. Alternative 3-0ne regional detention basin near the James RoadIHWY 91 intersection coupled with a second regional detention basin just north of the' southwest industrial park expansion and a third regional detention basin within the city limits under existing conditions. A preliminarY grading plan and outlet structure configuration for these three detention basin,S will be provided based on existing 2- foot contours provided by OWNER. 4. Alternative 4-Alternative 1 plus regional detention upstream for future development upstream. JHL:ebt\R:\DocmnentslAgreements\Oshkosh, City of (WI)\SawyerCreek2005-2006\Amd\1-382-022,2,doc .. sa. STRAND ASSOCIATES, INC.~ ENGINEERS City of Oshkosh, Wisconsin Page 2 October 10,2007 5. Alternative 5-Alternative 1 plus development-by-development basis. detention upstream a on 6. Alternative 6-Alternative 2 plus regional detention upstream for future development upstream. 7. Alternative 7-Alternative 2 plus development-by-development basis. detention upstream on a 8. Alternative 8-Altemative 3 plus regional detention upstream for future development upstream. 9. Alternative 9-Alternative 3 plus development-by-development basis. detention a upstream on 10. Alternative 10-Analysis of a single-mix of detention to optimize the downstream benefit based on detention provided in Alternatives 1 through 9." Under Compensation, CHANGE the lump sum fee from $90,200 to "$119,700." REPLACE table with the following: Field Investigation/Survey Meetings/Administration Stormwater Modeling! Analysis Stormwater Management Plan Total $ 6,000 15,160 48,310 50.230 $119,700 Under Schedule, DELETE existing language and REPLACE with: "The final plan incorporating the Scope of Services herein will be completed by approximately March 1,2008." Under Obligations of OWNER, ADD: "11. Provide written correspondence from the Wisconsin Department of Natural Resources regarding all wetlands, navigable waterways, and off-line detention that may arise out of this Project. This would include all delineations, determinations, variances, opinions, and permits." JHL:ebt\R:\DocmnentslAgreements\Osbkosb, City of (WI)\SawyerCreek200S-2006\Amd\1-3 82-022.2,doc , 1 sa. STRAND ASSOCIATES, INC." ENGINEERS City of Oshkosh, Wisconsin Page 3 October 10, 2007 IN WITNESS WHEREOF the parties hereto have made and executed this Amendment. ENGINEER: STRAND ASSOCIATES, INC. ~I/?""~"/ Roger H. Huchthausen Corporate Secretary /01/0/07 Date OWNER: CITY OF OSHKOSH Richard W ollangk City Manager Date Pamela R. Uhrig City Clerk Date Edward A. Nokes Finance Director Date Warren P. Kraft City Attorney Date JHL:ebt\R:\DocumentslAgreements\Osbkosh, City of (WI)\SawyerCreek.2005-2006\Amd\1-3 82-022,2,doc