HomeMy WebLinkAbout07-324 R.5~!~.5 D NOVEMBER 13, 2007 07 -324 RESOLUTION (CARRIED 6-0 LOST LAID OVER WITHDRAWN PURPOSE: INITIATED BY: CHANGE ORDER NO.2, PUBLIC WORKS CONTRACT NO. 06-02 WASTEWATER UTILITY PUMP STATION UPGRADES (-$2,655.00) DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: . AUGUST WINTER & SONS, INC. PO Box 1896 Appleton, WI 54913-1896 Net decrease to contract: -$2,655.00 PURPOSE: See attached Change Order. . Indicates Revision \ \. STRAND ASSOCIATES. INC." ENGINEERS 910 West Wingra Drive Madison. WI 53715 phone: 608-251-4843 Fax: 608-251-8655 Office Locations Madison, WI Joliet,IL Louisville, KY Lexington, KY Mobile, AL Columbus, IN Columbus, OH Indianapolis, IN Milwaukee, WI Cincinnati, OH www.strand.com October 8, 2007 CHANGE ORDER NO.2 PROJECT: OWNER: CONTRACT: CONTRACTOR: North Side, Snell Road, and Murdock Pumping Station Upgrades City of Oshkosh, Wisconsin 06-02 August Winter & Sons, Inc. Description of Change The following is a listing of the general contractor, subcontractor's, and supplier's various cost additions and deductions for the above contract as recommended by the Engineer. 2a Modifications to platform at North Side Pumping ADD Station to accommodate discharge piping reroute on Pump NP-04. 2b Credit for nomemoval of one stump at Murdock Pump DEDUCT Station. 2c Credit for 3 inches of asphalt placed at Murdock Pump DEDUCT Station versus 4-inch thickness specified. 2d Credit for two additional conduits not installed at DEDUCT Murdock Pump Station. 2e Credit to replace two trees at Murdock Pump Station DEDUCT not shown for removal in contract. 2f Credit for motor conduits at Murdock Pump Station DEDUCT installed on the main floor and not in the basement as shown on the drawings. 2g Credit to replace the conduit bushing at Murdock DEDUCT Pump Station wet well. TOTAL VALUE OF THIS CHANGE ORDER: DEDUCT Contract Price Adjustment Original Contract Price . Previous Change Order Adjustments Adjustment in Contract Price this Change Order Current Contract Price including this Change Order DEDUCT $ 735.00 $ (125.00) $ (525.00) $ (425.00) $ (1,890.00) $ (215.00) $ (210.00) $ (2,655.00) $757,835.00 $ 18,859.70 $ (2,655.00) $774,039.70 I , sa STRAND ASSOCIATES. INC. ENGINEERS ~ CITY OF OSHKOSH-AUGUST WINTER & SONS, me. CONTRACT NO.06-02, Change Order No.2 Page 2 October 8, 2007 Contract Completion Date Adjustment Original Contract Completion Date Substantial Completion Final Completion Contract Completion Date Adjustments due to previous Change Orders Contract Completion Date Adjustments due to this Change Order Current Contract Completion Dates including all Change Orders Substantial Completion Final Completion May 1, 2007 October 1, 2007 None None May 1, 2007 October 1, 2007 This document shall become a supplement to the Contract and all provisions will apply hereto. RECOMMENDED t i:I~ V' ENGINEER~ d Associates, Inc. APPROVED 7f..M-~ ~ CONTRACTOR-' gust Wmter & Sons, Inc. RECOMMENDED BY OWNER Director of Public Works APPROVED BY OWNER City Manager City Clerk I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under this Change Order. City Comptroller APPROVED AS TO FORM City Attorney/Assistant City Attorney JSR:ebt\S:\@SAI\351--400\382\028\Wrd\AugustWiuter Change Orders\CO 2.doc /u/P/o 7 Date Date IOI(o/~7 Date Date Date Date Date