RESOLUTION
(CARRIED 6-0
LOST
LAID OVER
WITHDRAWN
PURPOSE:
INITIATED BY:
CHANGE ORDER NO.2, PUBLIC WORKS CONTRACT NO. 06-02
WASTEWATER UTILITY PUMP STATION UPGRADES (-$2,655.00)
DEPARTMENT OF PUBLIC WORKS
BE IT RESOLVED by the Common Council of the City of Oshkosh that the following
Change Order, a copy of which is attached, is hereby approved:
. AUGUST WINTER & SONS, INC.
PO Box 1896
Appleton, WI 54913-1896
Net decrease to contract:
-$2,655.00
PURPOSE: See attached Change Order.
. Indicates Revision
\
\.
STRAND
ASSOCIATES. INC."
ENGINEERS
910 West Wingra Drive
Madison. WI 53715
phone: 608-251-4843
Fax: 608-251-8655
Office Locations
Madison, WI
Joliet,IL
Louisville, KY
Lexington, KY
Mobile, AL
Columbus, IN
Columbus, OH
Indianapolis, IN
Milwaukee, WI
Cincinnati, OH
www.strand.com
October 8, 2007
CHANGE ORDER NO.2
PROJECT:
OWNER:
CONTRACT:
CONTRACTOR:
North Side, Snell Road, and Murdock Pumping Station Upgrades
City of Oshkosh, Wisconsin
06-02
August Winter & Sons, Inc.
Description of Change
The following is a listing of the general contractor, subcontractor's, and supplier's various cost
additions and deductions for the above contract as recommended by the Engineer.
2a Modifications to platform at North Side Pumping ADD
Station to accommodate discharge piping reroute on
Pump NP-04.
2b Credit for nomemoval of one stump at Murdock Pump DEDUCT
Station.
2c Credit for 3 inches of asphalt placed at Murdock Pump DEDUCT
Station versus 4-inch thickness specified.
2d Credit for two additional conduits not installed at DEDUCT
Murdock Pump Station.
2e Credit to replace two trees at Murdock Pump Station DEDUCT
not shown for removal in contract.
2f Credit for motor conduits at Murdock Pump Station DEDUCT
installed on the main floor and not in the basement as
shown on the drawings.
2g Credit to replace the conduit bushing at Murdock DEDUCT
Pump Station wet well.
TOTAL VALUE OF THIS CHANGE ORDER:
DEDUCT
Contract Price Adjustment
Original Contract Price .
Previous Change Order Adjustments
Adjustment in Contract Price this Change Order
Current Contract Price including this Change Order
DEDUCT
$ 735.00
$ (125.00)
$ (525.00)
$ (425.00)
$ (1,890.00)
$ (215.00)
$ (210.00)
$ (2,655.00)
$757,835.00
$ 18,859.70
$ (2,655.00)
$774,039.70
I
,
sa
STRAND
ASSOCIATES. INC.
ENGINEERS
~
CITY OF OSHKOSH-AUGUST WINTER & SONS, me.
CONTRACT NO.06-02, Change Order No.2
Page 2
October 8, 2007
Contract Completion Date Adjustment
Original Contract Completion Date
Substantial Completion
Final Completion
Contract Completion Date Adjustments due to
previous Change Orders
Contract Completion Date Adjustments due to this
Change Order
Current Contract Completion Dates including all
Change Orders
Substantial Completion
Final Completion
May 1, 2007
October 1, 2007
None
None
May 1, 2007
October 1, 2007
This document shall become a supplement to the Contract and all provisions will apply hereto.
RECOMMENDED
t i:I~ V'
ENGINEER~ d Associates, Inc.
APPROVED
7f..M-~ ~
CONTRACTOR-' gust Wmter & Sons, Inc.
RECOMMENDED BY OWNER
Director of Public Works
APPROVED BY OWNER
City Manager
City Clerk
I certify that provision has been made to pay the liability that
will accrue to the City of Oshkosh, Wisconsin, under this
Change Order.
City Comptroller
APPROVED AS TO FORM
City Attorney/Assistant City Attorney
JSR:ebt\S:\@SAI\351--400\382\028\Wrd\AugustWiuter Change Orders\CO 2.doc
/u/P/o 7
Date
Date
IOI(o/~7
Date
Date
Date
Date
Date