HomeMy WebLinkAbout0127808-Building (roof)
e
OSHKOSH
ON THE WATER
Job Address 1740 GEORGIA ST
CITY OF OSHKOSH No 127808
BUILDING PERMIT - APPLICATION AND RECORD
Owner WALTER E ZEMKE Create Date 11/13/2007
Designer
Contractor RB ROOFING & SIDING
Category
141 - Exterior Remodeling Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Height
Ft.
D Projection I
Unfinished/Basement Sq. Ft.
Rooms
Canopies
Finished/Living
Sq. Ft.
Bedrooms
Stories
Garage
Sq.Ft.
Baths
Signs
Foundation 0 Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier . Other
o Treated Wood
Occupancy Permit Not Required
Occupancy Fee
$0.00 Flood Plain
Height Permit
# Dwelling Units
o
# Structures
o
Park Dedication
Use/Nature iSFR / Reroof - Tear off existing roofing, install new felt, shingles, vents, flashing. ~ Late Permit
of Work
HV AC Contractor
Plumbing Contractor
Electric Contractor
Issued By:
650.00 Plan Approval
$0.00 Permit Fee Paid
$60.00 Park Dedication
$0.00
Fees: Valuation
Date 11/13/2007
FinaIlO.P. 00/00/0000
D Permit Voided I
Parcelld # 1405870200
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure necessary approvals before sta' such activity.
Signature
/'
Date / /-1 .3 ()' ;/
Address 741 W 17TH AVE
AgenUOwner
OSHKOSH
WI 54902 - 0000
Telephone Number
426-2073
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.