HomeMy WebLinkAbout2007-Plumbing (water lateral)
o
OSHKOSH
ON THE WATER
Job Address 101 WYLDEWOOD DR
CITY OF OSHKOSH
No
127774
PLUMBING PERMIT - APPLICATION AND RECORD
Owner WYLDEWOOD VILLAGE APARTMENTS LLC Create Date 10/08/2007
Contractor 4 WAY CONSTRUCTION
Category 430 - Industrial-Exterior (laterals) Plan ZZ2-276-1007-P
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature
of Work
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
Water Softner Wait. St. Shamp Sink Coffee Maker
Local Waste Ice Chest FlrlWst Sink Int Grease Trap
Clothes Wshr Exam Sink Catch Basin Ext Grease Trap
Bidet Sculry Sink Wash Ftn RPZ Valve
Beer Tap Hand Sink Urinal Eye Wash Statn
Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs
Sterilizer Surgeons Sink Ice Maker Deduct Meters
Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs
Drink Ftn Serv Sink Soda Disp
INSTALL WATER LATERAL FOR NEW CLUB HOUSE FOR RESIDENTIAL COMPLEX
Size Material Type # Conn. Type
Sanitary Sewer Plastic Lateral 0 New
Storm Sewer
Water Service 2" Plastic Lateral 1 New
Parcel Id #
0632100000
Valuation
Issued By
$750.00 Plan Approval
$0.00 Permit Fees
$50.00 0 Permit Voided I
Date 11/12/2007
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easem t, the City strongly urges the permit applicant to contact the
easement holder(s) an sec e any necess~ry, prev ef starting such activity.
Signature Date
/~2/o
/
Address P.O. BOX 1
BERLIN
WI 54923 - 0133 Telephone Number 920-361-1403
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (I.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.