Loading...
HomeMy WebLinkAbout2007-Plumbing (water lateral) o OSHKOSH ON THE WATER Job Address 105109 WYLDEWOOD DR CITY OF OSHKOSH No 127775 PLUMBING PERMIT - APPLICATION AND RECORD Owner WYLDEWOOD VILLAGE APARTMENTS LLC Contractor 4 WAY CONSTRUCTION Create Date 10/08/2007 Category 430 - Industrial-Exterior (laterals) Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Water Softner Local Waste Clothes Wshr Bidet Beer Tap Lab Sink Sterilizer Dip Well Drink Ftn Plan ZZ2-276-1007-P Wait. St. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature INSTALL WATER LATERAL FOR 8 UNIT RESIDENTIAL of Work Shamp Sink FlrlWst Sink Catch Basin Wash Ftn Urinal Standp Rec Ice Maker Gar Drain Soda Disp Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs i Valuation Issued By Sanitary Sewer Storm Sewer Water Service Size 2" Material Plastic Plastic Type Lateral # Conn. Type o New $750.00 Plan Approval Parcel Id # $0.00 Permit Fees $50.00 0 Permit Voided I Lateral New Date 11/12/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder( secure any ne ary aR al efore starting such activity. Signature Address BERLIN WI 54923 - 0133 ~~#7 Telephone Number 920-361-1403 To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.