HomeMy WebLinkAbout2007-Plumbing (water lateral)
o
OSHKOSH
ON THE WATER
Job Address 119 129 WYLDEWOOD DR
CITY OF OSHKOSH
No 127777
PLUMBING PERMIT - APPLICATION AND RECORD
Owner WYLDEWOOD VILLAGE APARTMENTS LLC
Create Date 10/08/2007
Category 430 - Industrial-Exterior (laterals)
Plan ZZ2-276-1007-P
Contractor 4 WAY CONSTRUCTION
Bathtub Shower Water Softner Wait. St. Shamp Sink Coffee Maker
Whirlpool Floor Drain Local Waste Ice Chest Flr/Wst Sink Int Grease Trap
Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin Ext Grease Trap
Toilet Disposal Bidet Sculry Sink Wash Ftn RPZ Valve
Res. Sink Dishwasher Beer Tap Hand Sink Urinal Eye Wash Statn
Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs
Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker Deduct Meters
Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs
Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp
Misc.
Fixtures
Use/Nature ,INSTALL WATER LATERAL FOR 8 UNIT RESIDENTIAL
of Work
Size
Material
Plastic
Type
Lateral
# Conn. Type
o New
Sanitary Sewer
Storm Sewer
Water Service
2"
Plastic
Lateral
New
Parcelld #
Valuation
$750.00 Plan Approval
$0.00 Permit Fees
$50.00 0 Permit Voided I
Issued By
Date 11/12/2007
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and t cure any necessary a provals efore starting such activity.
Signature
BERLIN
WI 54923 - 0133
Dme#
Telephone Number 920-361-1403
Address
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.