Loading...
HomeMy WebLinkAbout2007-Plumbing (water lateral) o OSHKOSH ON THE WATER Job Address 119 129 WYLDEWOOD DR CITY OF OSHKOSH No 127777 PLUMBING PERMIT - APPLICATION AND RECORD Owner WYLDEWOOD VILLAGE APARTMENTS LLC Create Date 10/08/2007 Category 430 - Industrial-Exterior (laterals) Plan ZZ2-276-1007-P Contractor 4 WAY CONSTRUCTION Bathtub Shower Water Softner Wait. St. Shamp Sink Coffee Maker Whirlpool Floor Drain Local Waste Ice Chest Flr/Wst Sink Int Grease Trap Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin Ext Grease Trap Toilet Disposal Bidet Sculry Sink Wash Ftn RPZ Valve Res. Sink Dishwasher Beer Tap Hand Sink Urinal Eye Wash Statn Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker Deduct Meters Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp Misc. Fixtures Use/Nature ,INSTALL WATER LATERAL FOR 8 UNIT RESIDENTIAL of Work Size Material Plastic Type Lateral # Conn. Type o New Sanitary Sewer Storm Sewer Water Service 2" Plastic Lateral New Parcelld # Valuation $750.00 Plan Approval $0.00 Permit Fees $50.00 0 Permit Voided I Issued By Date 11/12/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and t cure any necessary a provals efore starting such activity. Signature BERLIN WI 54923 - 0133 Dme# Telephone Number 920-361-1403 Address To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.