Loading...
HomeMy WebLinkAbout2007-Plumbing (laterals) o OSHKOSH ON THE WATER Job Address 165175 WYLDEWOOD DR CITY OF OSHKOSH No 127780 PLUMBING PERMIT - APPLICATION AND RECORD Owner WYLDEWOOD VILLAGE APARTMENTS LLC Create Date 10/08/2007 Contractor 4 WAY CONSTRUCTION Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Valuation Issued By Category 430 - Industrial-Exterior (laterals) Plan ZZ2-276-1007-P Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Water Softner Wait. St. Shamp Sink Coffee Maker Local Waste Ice Chest FlrlWst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin Ext Grease Trap Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Ree Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp INSTALL WATER LATERAL FOR 8 UNIT RESIDENTIAL Size Material Type # Conn. Type Sanitary Sewer Plastic Lateral 0 New Storm Sewer Water Service 2" Plastic Lateral 1 New Parcelld # $750.00 Plan Approval $0.00 Permit Fees $50.00 D Permit Voided I Date 11/12/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) any necess ry app.rovals before starting such activity. Signature Address Date BERLIN WI 54923 - 0133 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.