Loading...
HomeMy WebLinkAbout2007-Plumbing (lateral) e OSHKOSH ON THE WATER Job Address 169179 WYLDEWOOD DR CITY OF OSHKOSH No 127781 PLUMBING PERMIT. APPLICATION AND RECORD Owner WYLDEWOOD VILLAGE APARTMENTS LLC Create Date 10/08/2007 Plan ZZ2-276-1007-P Contractor 4 WAY CONSTRUCTION Category 430 - Industrial-Exterior (laterals) Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Water Softner Wait. St. Shamp Sink Coffee Maker Local Waste Ice Chest FlrlWst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin Ext Grease Trap Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp INSTALL WATER LATERAL FOR 8 UNIT RESIDENTIAL Size Material Type # Conn. Type Sanitary Sewer Plastic Lateral 0 New Storm Sewer Water Service 2" Plastic Lateral 1 New Parcelld # Valuation Issued By $750.00 Plan Approval $0.00 Permit Fees $50.00 D Permit Voided I Date 11/12/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any nece pprovals before starting such activity. Signature Agent/Owner BERLIN Date //~zh~ /7 --- Telephone Number 920-361-1403 Address WI 54923 - 0133 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.