Loading...
HomeMy WebLinkAbout0121849-Plumbing (additional work) e OSHKOSH ON THE WATER Job Address 580 S KOELLER ST CITY OF OSHKOSH No 121849 PLUMBING PERMIT - APPLICATION AND RECORD Contractor O'NEILL ENTERPRISES INC Category 440 - Industrial-Interior Owner RIVER VALLEY ONE LLC Create Date 10/03/2006 Plan Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Shower Water Softner Wait. St. Floor Drain Local Waste Ice Chest Lndry Tray Clothes Wshr Exam Sink Disposal Bidet Sculry Sink Dishwasher Beer Tap Hand Sink Sump Pump Lab Sink Plaster Sink Classrm Sink Steri Iizer Surgeons Sink Breakrm Sink Dip Well F Prep Sink Ejector/Grind Drink Ftn Serv Sink 4 1 orange juice dispenser, 3 ice tea dispensers. Shamp Sink FlrlWst Sink Catch Basin Wash Ftn Urinal Standp Rec Ice Maker Gar Drain Soda Disp Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs 3 3 ~ork added to permit #120038 "debit acct Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 0611620000 Valuation Issued By $93,000.00 $0.00 Permit Fees $70.00 0 Permit Voided I Plan Approval Date 10/03/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Address 522 W 6TH AVE Agent/Owner OSHKOSH WI 54902 - 0000 Telephone Number 920-230-2007 Date To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.