HomeMy WebLinkAbout0127731-Building
o
OSHKOSH
ON THE WATER
Job Address 2307 DOTY ST
CITY OF OSHKOSH No 127731
BUILDING PERMIT - APPLICATION AND RECORD
Owner CARIE A SCHNEIDER Create Date 11/08/2007
Designer
Contractor THOMAS MADER C.
Category
140 - Interior Remodeling Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement Sq. Ft.
Rooms
Height
Ft.
o Projection I
Finished/Living
Sq. Ft.
Sq.Ft.
Bedrooms
Stories
Canopies
Garage
Baths
Signs
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit
Occupancy Fee
$0.00 Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
o
Use/Nature SFRI Remodel bathroom" on the 1st floor to include mo\ling a wall approximately 2' into the existing closet behind the bathroom and
of Work reframe to a larger door opening.
,
HV AC Contractor
Plumbing Contractor HANSON QUALITY PLUMBING
Electric Contractor SCHNEIDER ELECTRIC
Fees: Valuation
$7,500.00 Plan Approval
$0.00 Permit Fee Paid
$74.00 Park Dedication
$0.00
Issued By:
~
Date 11/08/2007 FinaIlO.P. 00/00/0000
o Permit Voided I
Parcelld # 1403220000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) 0 secure any necessa appr v s ti fore starting such activity.
Address
3636 WAYMAN CT
Agent/Owner
APPLETON
Date~/I-oB- 07
Signatur
WI 54914 - 0000
Telephone Number
731-6850
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (I.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.