Loading...
HomeMy WebLinkAbout0127729-Plumbing (parking lot) G OSHKOSH ON THE WATER Job Address 954 958 W 6TH AVE CITY OF OSHKOSH No 127729 PLUMBING PERMIT - APPLICATION AND RECORD Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Owner DENNIS E SCHWAB Create Date 11/08/2007 Category 430 - Industrial-Exterior (laterals) Plan Water Softner Wait. St. Shamp Sink Coffee Maker Local Waste Ice Chest FlrlWst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin 2 Ext Grease Trap Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Contractor DR HANSEN PLBG. Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Valuation Issued By Install storm drain lateral and catch basins for new parking lot area to be installed from newly aquired lots. Size Material Type # Conn. Type Sanitary Sewer Storm Sewer 12" Plastic Lateral 1 New Water Service Parcel Id # 0604370000 $6,500.00 Plan Approval $0.00 Permit Fees $64.00 D Permit Voided I Date 11/08/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner OSHKOSH WI 54902 - 3448 Telephone Number 233-1595 Address 55 KNAPP ST To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.