Loading...
HomeMy WebLinkAbout2007-Building (2) o OSHKOSH ON THE WATER Job Address 1102 ADAMS AVE CITY OF OSHKOSH No 127717 BUILDING PERMIT - APPLICATION AND RECORD Owner KERRY DERR Create Date 08/15/2007 Designer Contractor AREA WATERPROOFING & CONCRETE Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Class of Const: Size Rooms Height Ft. o Projection I - Bedrooms Stories Canopies - Baths Signs Zoning Unfinished/Basement Sq.Ft. Finished/Living Sq.Ft. Sq.Ft. Garage Foundation 0 Poured Concrete 0 Floating Slab . Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature SFR/ CityRehab / Excavating the south, east, and west foundation walls, and reinforcing all foundation waifS-With steel beams. of Work HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $12,055.00 /~Ian A~.rOV;!!___/-~$O,OO Permit Fee Paid =?))~~ (~ o Permit Voided I $106.00 Park Dedication $0.00 Issued By: Date 11/07/2007 Final/O.P. 00/00/0000 Parcelld # 1605580000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary pprovals be~ rting such activity. Signature (' -===- Date X" // /7/6/ Agent/Owner Oshkosh Address 4120 SANDPIT RD WI 54904 - 0000 Telephone Number 229-0926 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.