Loading...
HomeMy WebLinkAbout0127682-Plumbing (water heater) e CITY OF OSHKOSH OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 1015 PHEASANT CREEK DR Owner THOMAS P/MARY C SALZER No 127682 ___ Category ~1J_=-- Res~entiClI:l{\later fieClt~!;_____________ Plan Create Date 11/06/2007 Contractor SAMMONS PLUMBING Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature SFRlINSTALCNGWA fER -HEA TEFC*"debiaccf- of Work Shower Water Softner Local Waste Clothes Wshr Bidet Beer Tap Lab Sink Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Sterilizer Dip Well Drink Ftn Wait. St. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink Material Shamp Sink FlrlWst Sink Catch Basin Wash Ftn Urinal Standp Rec Ice Maker Gar Drain Soda Disp Type # Conn. Type Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Size I ___~~____.........J Sanitary Sewer Storm Sewer Water Service Parcelld # 1342620000 Address 522 W. MURDOCK AVE Agent/Owner OSHKOSH Signature ::::::: 25:i:O $fO.OQ p,," Approvo' --.-.. .tQJJo P"ml' Foes __ __$2~QQ OPe""". Vo"" Date 11/06/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Date WI 54901 - 2298 Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.