Loading...
HomeMy WebLinkAbout0127673-Plumbing (toilet) e OSHKOSH ON THE WATER Job Address 643 CEAPE AVE CITY OF OSHKOSH 127673 No PLUMBING PERMIT - APPLICATION AND RECORD Contractor SAMMONS PLUMBING Shower Owner JOHN W GRADL Create Date 11/06/2007 ---- Category 410 - Residential-Interior Plan -_._._.._~---~ Water Softner Wait. St. Shamp Sink Coffee Maker Local Waste Ice Chest FlrlWst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin Ext Grease Trap Bidet Sculry Sink Wash Ftn RPZ Valve <ill Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature ISFR /INSTALL TOILET '*debt acct of Work i I I Valuation $400.00 Plan Approval ____~~Q_Q Permit Fees ______E5.0~ 0 p~mi_~\i'<:lided-j Issued By ~b -- .. In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind -~-~-~.._---_._---------~-~--'-_.._.._--_.. ___J Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 0801030000 Date 11/06/2007 Date Agent/Owner OSHKOSH WI 54901 - 2298 Telephone Number 231-9880 Address 522 W. MURDOCK AVE To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.