HomeMy WebLinkAboutCampbell Creek Amendment #4
Office Locations
-......,.
~
. "."-'-,-0'-'- ~-,,,,,,,,,,,.',,,,,",,._.n,.-"""'."'"''''''--'''-''''
/1-1-1.001
<f uY\ - 4+tc..t..kJ. 6 ~J to. ') tr....d
~).....J ""L ~~ c.r~~ t~.r
..)tnl.V ~ >, 7t~>. J)c.P
C<:- ~ k. (U1\~ G'l(j~'..9 )
c...: A -#, Co-
$,
STRAND · 'i '
ASSOCIATES INC.~ .- ~
ENGINEt:RS ,.-
I. crrv
910 West Wingra Drive
Madison, WI 53715
Phone: 608-251-4843
Fax: 608-251-8655
To:
David C. Patek, P.E.
City of Oshkosh
215 Church Avenue, PO Box 1130
Oshkosh, VV154903-1130
Madison, WI
Joliet, IL
Lexington, KY
Louisville, KY
Mobile, AL
Columbus, IN
Columbus, OH
Indianapolis, IN
Milwaukee, WI
Cincinnati, OH
Date:
Attention:
October 10, 2007
1-382.022
RE:
tlt- Campbell Creek Amendments
WE ARE SENDING YOU:
181 Attached
o Under Separate Cover
www.strand.com
o Shop Drawings
o Change Order
o Copy of Letter
. 0 Specifications
o Drawings
o Samples
o Other:
Copies Date No. Description
2 .s .... .. wfl/lSas~I~~~""~
2 North Branch Campbell Creek SMP Amendment No.4
THESE ARE TRANSMITTED as checked below:
o For approval
o For your use
o As requested
o For review and comment
o Approved as submitted
o Approved as noted
o Returned for corrections
o Other
o Resubmit ---'- copies for approval
o Submit _ copies for distribution
o Return _c orrected prints
Remarks:
David-
Two originals of each amendment signed by Strand are enclosed. Please review, sign and
date and return 1 copy of each amendment back to Strand.
Jo
Copy to: James. !ZC'f6e-
I
U-f1;tr ~.
t!, ~ t::l aJ,i:.osJ.,
Signed:
S:\@SAI1351-400\382\030IWrd\Transmittal LetterAMD4 and AMD2.doc
'.
,.'.1
sa
STRANO
ASSOCIATES, ING@
ENGINEERS
910 West Wingra Drive
Madison, WI 53715
Phone: 608-251-4843
Fax: 608-251-8655
Office Locations
Madison, WI
Joliet,IL
Louisville, KY
Lexington, KY
Mobile, AL
Columbus, IN
Columbus, OH
Indianapolis, IN
Milwaukee, WI
Cincinnati, OH
www.strand.com
October 10,2007
City of Oshkosh
215 Church Avenue
Oshkosh, VVI 54903-1130
Attention:
David Patek, P.E., Director of Public Works
Re: Agreement for Planning Services-Amendment No.4
North Branch Campbell Creek Stormwater Management Plan
This is Amendment No. 4 to the referenced Agreement for Planning Services dated
May 26,2005.
Under Scope of Services, Item D. Analysis of potential impacts of future development on
existing drainage system, DELETE 16. and REPLACE with:
"16. Alternative 13-Using the updated model, analysis of the effect ofremoving the
9th Street/Washburn Street detention basin from Alternative 12 and including
new detention basin(s) located in the Westhaven Golf Course with a 75-foot
buffer between the back property lines of the adjacent residential property and
the edge of the proposed walking path. The Westhaven detention basins will be
sized to have an out-of-system flooding volume similar to the out-of-system
flooding volume in Alternative No. 12. A conceptual park layout will not be
included with this alternative. The Armory detention basin footprint will be
reduced so that it does not include the 5 acres of commercial property on the
west end."
Under Scope of Services, Item D. Analysis of potential impacts of future developm(mt on
existing drainage system, DELETE 19. and REPLACE with:
"19. Alternative 16-U sing the updated model, analysis of the effect of removing the
9th StreetlWashburn Street detention basin from Alternative 12 and including
new detention basins in the Westhaven Golf Course. The basins will be designed
with a 75-foot buffer between the adjacent residential property and the proposed
walking path. A conceptual park layout will not be included with this
alternative.
This Westhaven detention basin design will maximize the obtainable storage
volume based on the area drawing to the pond to match the effect of Altemative
No. 13 analyzed in the August 2007 Draft Report."
Under Obligations of OWNER, ADD:
"8. Provide written correspondence from the Wisconsin Department of Natural
Resources regarding all wetlands, navigable waterways, and off-line detention
that may arise out of this Project. This would include all delineations,
determinations, variances, opinions, and permits."
-.-. . ""--. +
'i.~'~"
sa
STRAND
ASSOCIATES, INC.'t>
ENGINEERS
City of Oshkosh
Page 2
October 10, 2007
Under Compensation, CHANGE the lump sum fee from $121,800 to "$130,300."
REPLACE table with the following:
Topographical Survey
Meetings
Stormwater Modeling/Analysis
Stormwater Management Plan
DELETE Schedule and REPLACE with:
Schedule
Total
Total Cost
$ 13,500
10,800
72,500
33,500
$130,300
"The final draft Plan Amendment will be completed approximately two and one-half months
after Amendment No.4 is signed."
IN WITNESS WHEREOF the parties hereto have made and executed this Agreement.
ENGINEER:
STRAND ASSOCIATES, me.
OWNER:
CITY OF OSHKOSH
~frH-;##~ /ohf)/.#7
Roger . Huchthausen Dat~'.
Corporate Secretary /Jer.'W4-
h~City Clerk
~~(1..),{ JJ (} Gle.~
Edward A. Nokes
City 0 ptroller
10/31107
,
Date
/O/dl)07
Date
JHL:ebt\R:\Docrnnents\Agreements\Oshkosh, City of (WI)\CampbellCreekStrmwtrPln.2005-2007\Amd\ 1-382-03 O.4.doc