Loading...
HomeMy WebLinkAbout0127636-Building o OSHKOSH ON THE WATER Job Address 1815 TAFT AVE CITY OF OSHKOSH No 127636 BUILDING PERMIT - APPLICATION AND RECORD Owner DUMKE & ASSOCIATES LLC Create Date 10/29/2007 Designer Contractor OWNER Category 161 _ Wrecking Residential Dwellings Plan Type o Building o Sign o Canopy o Fence . Raze Zoning Class of Const: Size Finished/Living Sq.Ft. Sq. Ft. Sq.Ft. Rooms Height Ft. o Projection I Unfinished/Basement Bedrooms Stories Canopies Garage Baths Signs Foundation o Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood . Other Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication # Dwelling Units # Structures Use/Nature SFRI Raze and Remove remnants of house after use by Fire Dept. for training:- of Work HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $4,500.00 Plan Approval $0.00 Permit Fee Paid $53.00 Park Dedication $0.00 Issued By: 0fJ Date 11/05/2007 Final/O. P. 00/00/0000 o Permit Voided I Parcelld # 1608700901 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature yc- {2J .M.,.J ., LLl~ ~ lJ M k e /-7S'S; ad '9 /.-.<>3 Date ,.L11-0 sf. () -') Agent/Owner Address 222 OHIO ST OSHKOSH WI 54902 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.