Loading...
HomeMy WebLinkAbout0127608-Plumbing cO OSHKOSH ON THE WATER Job Address 1025 HARNEY AVE CITY OF OSHKOSH No 127608 PLUMBING PERMIT - APPLICATION AND RECORD Owner RONALD T SCHIMKE Create Date 07/19/2007 Plan Contractor RJ KAMPO PLBG Category 410 - Residential-Interior Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Water Softner Local Waste Clothes Wshr Bidet Beer Tap Lab Sink Sterilizer Dip Well Drink Ftn Wait. St. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink Shamp Sink FlrlWst Sink Catch Basin Wash Ftn Urinal Standp Rec Ice Maker Gar Drain Soda Disp Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs REMODEL 1ST-FLOOR KITCHEN.--------------------~-------------..----------.-----.------ I I I ' l___ Sanitary Sewer Storm Sewer Water Service Size Material Type # Conn. Type Parcelld # 0805690000 Valuation____....1.1.'..~Q9.00 Plan Approval ____~:OO Permit Fees Issued By $25.00 0 Pe~it Voide<!j Date 11/01/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Address 1000 S WESTLAND DR Agent/Owner APPLETON Date WI 54914 - 8862 Telephone Number 730-9600 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.