HomeMy WebLinkAbout0127593-Plumbing (lateral)
e
OSHKOSH
ON THE WATER
Job Address 32 EVELINE ST
CITY OF OSHKOSH No 127593
PLUMBING PERMIT - APPLICATION AND RECORD
Owner ORIN K/MELlSSA SCHIMMEL JR Create Date 11/01/2007
Plan
Contractor D.R. HANSEN PLBG.
Category 401 - Residential-Exterior (laterals)
Bathtub Shower Water Softner Wait. St. Shamp Sink
Whirlpool Floor Drain Local Waste Ice Chest Flr/Wst Sink
Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin
Toilet Disposal Bidet Sculry Sink Wash Ftn
Res. Sink Dishwasher Beer Tap Hand Sink Urinal
Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec
Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker
Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain
Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp
Misc.
Fixtures
Use/Nature Install new 1-1/4" water lateral.
of Work
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Size
Material
Type
#
Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
1-1/4"
Plastic
Lateral
Relay
Valuation
$3,000.00 Plan Approval
$0.00 Permit Fees
$50.00 D Permit Voided I
Issued By
Parcelld #
0803740000
Date 11/01/2007
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Address 55 KNAPP ST
Agent/Owner
OSHKOSH
WI 54902 - 3448 Telephone Number 233-1595
Date
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.