Loading...
HomeMy WebLinkAbout0127612-Plumbing (storm lateral) o OSHKOSH ON THE WATER Job Address 1113 W 11TH AVE Contractor MOREMAN PLBG & HTG SERVICE INC CITY OF OSHKOSH No 127612 PLUMBING PERMIT - APPLICATION AND RECORD Owner STEVE NYHUIS Create Date 11/01/2007 Category 401 - Residential-Exterior (laterals) Plan Bathtub Shower Water Softner Wait. St. Shamp Sink Whirlpool Floor Drain Local Waste Ice Chest FlrlWst Sink Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin Toilet Disposal Bidet Sculry Sink Wash Ftn Res. Sink Dishwasher Beer Tap Hand Sink Urinal Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp Misc. Fixtures Use/Nature of Work Valuation Issued By Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Install 4" storm lateral. Size Material Type # Conn. Type Sanitary Sewer Storm Sewer 4" Plastic Lateral 1 New Water Service Parcelld # $0.00 Permit Fees $50.00 0 Permit Voided I Date 11/01/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary a,pproval~~ffr starting such activity. Signature W~ R. 5'~g_ Date II,.....ol.-07 Agenuct;;'er Address PO BOX 1325 OSHKOSH WI 54903 - 1325 Telephone Number (920) 231-9191 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.