Loading...
HomeMy WebLinkAbout0127596-Building (Raze garage) e OSHKOSH ON THE WATER Job Address 1035 W 9TH AVE CITY OF OSHKOSH No 127596 BUILDING PERMIT - APPLICATION AND RECORD Owner JAMIE M/MELlSSA M LARSON Create Date 11/01/2007 Designer Contractor OWNER Category 162 - Wrecking Residential Accessory Structures Plan Type o Building o Sign o Canopy o Fence . Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. D Projection I Canopies Finished/Living Sq.Ft. Sq.Ft. Bedrooms Stories Garage Baths Signs Foundation 0 Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier . Other o Treated Wood none Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures Use/Nature RES / Raze and Remove Detached Garage.* Note: The footprint of the garage shall be restored to lawn area with topsoilcmdgiass (Ct--- of Work ther acceptable landscaping.) Any other proposed use, such as parking, in this location must be approved. HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuatio $1,000.00 Plan Approval $0.00 Permit Fee Paid $25.00 Park Dedication $0.00 Issued By: Date 11/01/2007 Final/O.P. 00/00/0000 D Permit Voided I Parcel Id # 1305260000 ee to perform all work pursuant to rules governing the described construction. While the City of Oshkosh s n authority to enforce easement restrictions of which it is not a party, if you perform the work described in this perm' pplic ion within an easement, City strongly urges the permit applicant to contact the easement holder(s) and to se re an ecessa.cY approval bet starting such activity. Date 1/)7 Signature Address 103 Agent/Owner OSHKOSH WI 54902 - 6201 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.