HomeMy WebLinkAbout0127596-Building (Raze garage)
e
OSHKOSH
ON THE WATER
Job Address 1035 W 9TH AVE
CITY OF OSHKOSH No 127596
BUILDING PERMIT - APPLICATION AND RECORD
Owner JAMIE M/MELlSSA M LARSON Create Date 11/01/2007
Designer
Contractor OWNER
Category
162 - Wrecking Residential Accessory Structures Plan
Type
o Building
o Sign
o Canopy
o Fence
. Raze
Zoning
Class of Const:
Size
Unfinished/Basement Sq. Ft.
Rooms
Height
Ft.
D Projection I
Canopies
Finished/Living
Sq.Ft.
Sq.Ft.
Bedrooms
Stories
Garage
Baths
Signs
Foundation 0 Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier . Other
o Treated Wood
none
Occupancy Permit Not Required
Occupancy Fee
$0.00 Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
Use/Nature RES / Raze and Remove Detached Garage.* Note: The footprint of the garage shall be restored to lawn area with topsoilcmdgiass (Ct---
of Work ther acceptable landscaping.) Any other proposed use, such as parking, in this location must be approved.
HV AC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuatio
$1,000.00 Plan Approval
$0.00 Permit Fee Paid
$25.00 Park Dedication
$0.00
Issued By:
Date 11/01/2007
Final/O.P. 00/00/0000
D Permit Voided I
Parcel Id # 1305260000
ee to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh s n authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this perm' pplic ion within an easement, City strongly urges the permit applicant to contact the easement
holder(s) and to se re an ecessa.cY approval bet starting such activity.
Date
1/)7
Signature
Address
103
Agent/Owner
OSHKOSH
WI 54902 - 6201
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.