Loading...
HomeMy WebLinkAbout0127578-Building (front porch) e OSHKOSH ON THE WATER Job Address 330 E PARKWAY AVE CITY OF OSHKOSH No 127578 BUILDING PERMIT - APPLICATION AND RECORD Owner JEFFREY P LEE Create Date 10/29/2007 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. D Projection I Canopies Finished/Living Sq. Ft. Bedrooms Stories Garage Sq.Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature FRI LATE PERMIT/Reconstructed the front porch floor system including guardrails and handrails. The existingfootihgs were used and of Work he roof remains. Plumbing Contractor HVAC Contractor Electric Contractor $2,000.00 Plan Approval $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 Fees: Valuation Issued By: Date 10/31/2007 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 0403360000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary aR rovals before starting such activity. Signature fJ Date /0 '3/, a 7 AgenUOwner Address 330 E PARKWAY AVE OSHKOSH WI 54901 - 4540 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.