HomeMy WebLinkAbout0127578-Building (front porch)
e
OSHKOSH
ON THE WATER
Job Address 330 E PARKWAY AVE
CITY OF OSHKOSH No 127578
BUILDING PERMIT - APPLICATION AND RECORD
Owner JEFFREY P LEE Create Date 10/29/2007
Designer
Contractor OWNER
Category
141 - Exterior Remodeling Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement Sq. Ft.
Rooms
Height
Ft.
D Projection I
Canopies
Finished/Living
Sq. Ft.
Bedrooms
Stories
Garage
Sq.Ft.
Baths
Signs
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit Not Required
Occupancy Fee
$0.00 Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
o
Use/Nature FRI LATE PERMIT/Reconstructed the front porch floor system including guardrails and handrails. The existingfootihgs were used and
of Work he roof remains.
Plumbing Contractor
HVAC Contractor
Electric Contractor
$2,000.00 Plan Approval
$0.00 Permit Fee Paid
$32.00 Park Dedication
$0.00
Fees: Valuation
Issued By:
Date 10/31/2007
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 0403360000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary aR rovals before starting such activity.
Signature fJ Date /0 '3/, a 7
AgenUOwner
Address 330 E PARKWAY AVE
OSHKOSH
WI 54901 - 4540 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.