Loading...
HomeMy WebLinkAbout0127555-Building (front porch) e OSHKOSH ON THE WATER Job Address 110 W 11TH AVE CITY OF OSHKOSH No 127555 BUILDING PERMIT - APPLICATION AND RECORD Owner THOMAS F STEIN Create Date 10/30/2007 Contractor LEACH BROS. Designer Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. D Projection I Finished/Living Sq.Ft. Bedrooms Stories Canopies Garage Sq.Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature ISFRI Repair vehicle damage to front porch' Some foundation work will have to be done. All work shall comply with appliCable building of Work codes. HV AC Contractor Plumbing Contractor Electric Contractor $7,000.00 Plan Approval $0.00 Permit Fee Paid $67.00 Park Dedication Fees: Valuation $0.00 Issued By: 'V7 Date 10/30/2007 Final/O.P. 00/00/0000 D Permit Voided I Parcel Id # 0302330000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to see ny necessary approvals before starting such activity. Date <:/ tJ/~r()? Signature Address 2883 RUSCHFIELD DR Agent/Owner Oshkosh WI 54904 - 0000 Telephone Number 420-5005 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.