HomeMy WebLinkAbout0127541-Building
e
OSHKOSH
ON THE WATER
Job Address 2875 HOMESTEAD DR
CITY OF OSHKOSH
No
127541
BUILDING PERMIT - APPLICATION AND RECORD
Owner RUSCH HO~~~~f_______ Create Date 10/18/2007
Designer
Contractor RUSCH HOMES LLC
Category
t1.9-=-_(\jEO"':' Sinj;l~J::~mily
Plan 051-1007
Type
._~~i'9~_____D Si9!.:'_ ___O_f~noeL______Di~r:~El______ _.__0 Ra~~._
Zoning
R-1
Class of Const: 8
Size IrrL.____._
Bedrooms
5
3
Height 18 Ft.
O_~roj~ction J
Canopies
Unfinished/Basement 1302 Sq. Ft.
Finished/Living _. 1302 Sq. Ft.
Rooms
Stories
Signs
Garage
~ Sq.Ft.
Baths
2
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit ~~9uirEl~____ Occupancy Fee
$0.00 Flood Plain No
Height Permit Not_REl_C1uired
Park Dedication
f:'J~L!35lqu~~._
# Dwelling Units
# Structures
Use/Nature [NSFRTNew-smgJefamify*Tstory:2carattachedgarag-e-and13'x'15'patio_' The driveway will be 20' wide.
of Work
;
.-.----.-------j
HVAC Contractor
CONDON TOTAL COMFORT
Plumbing Contractor PLUMBING CONTRACTOR SPECIALIST
Electric Contractor CUMINGS ELECTRIC INC
$100,000.00
Plan Approval __.__~_?~OO Permit Fee Paid
$418.00 Park Dedication
$0.00
Fees: Valuation
Issued By:
Date 1 0/29/2007
FinaIlO.P. .22~00/QgQg
D _-,=-ermit V~i9~~
Parcelld # 1341950000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure ~ R ovals before starting such activity.
Signature tI-c..-t Date
Agent/Owner
Address
POBOX 423 OMRO
WI 54963 - 0000
Telephone Number
685-0241
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
~Ot
\ C{I'
vY- \
~~o 1
'('\ \ e- )
13~15
PATIO IS'
1'31
f)!;t
jq'
xY>f
:27'
1'1'
I
I
69.1 g'
I
dJI
,P,4tl1NIo r
PA-D
30'
r
',,1\,' ' 'i
/1"\'
J.<t7" H~
l ~6'
t
OCT 1 6 2007
\i1l,
~
~
DEPARTf'1ENT OF
COiv'iMUNlTY DEVELOP~~ENT
INSPECTION SERVICES DIVISION
Wisconsin Department of Industry,
Labor and Human Relations
Safety and Buildings Division
P,O, Box 2509
Madison, WI 53701-2509
Wisconsin Statues 101.63, 101.73
WISCONSIN UNIFORM
BUILDING PERMIT
APPLlCA TION
Application No,
0127541
Parcel No.
D Constr
Plbg Lic/Cert #
879882
Plbg Lic/Cert #
170792
Plbg Lic/Cert #
3202
Lic/Cert #
230863
D HVAC DElee
Mailing Address
PO BOX 423
Mailing Address
POBOX 423
Mailing Address
PO BOX 749
Mailing Address
PO BOX 184
Mailing Address
1226 CHELSEA CT
D Plbg
o Erosion D Other:
Telephone No,
OMRO WI 54963 - 0423
Telephone No,
OMRO WI 54963 - 0 685-0241
Telephone No.
NEENAH WI 54957 - 749 920-231-5946
Telephone No,
RIPON WI 54971 _ 184 920-748-5050
Telephone No.
MENASHA WI 54952 - 0 920-749-9121
1/4,Section ,T N,R E(or)W
Lot No, Block No,
Building Address
2875 HOMESTEAD DR
Zoning District(s)
S ,ft. 1/4,
Subdivision Name
Forced Air Furnace
D Radiant Baseboard or Panel
D Heat Pump
D Boiler
D Central Air Conditioning
Other
Nat. L.P, Oil Elec. Solid
Gas
Space Htg 0 D D D D D
Water Htg 0 D D D D D
Dwelling unit will have 3 kilowatt or
more installed electric space heating equip,
Infiltration control option is: D Full sealing
of joints, D Blower door test. D Exterior
air infiltration barrier.
1302
Living Area
Garage _
1302
-.----
462
o Plus Basement
The applicant agrees to comply with all applicable code , s
the permit creates no legal liability, express o~ n
APPLICANT'S SIGNATURE ~"';;""A
o Municipal Utility
D Private On-Site Well
s and ordinances and with the conditions of this permit, understands that the issuance of
epartment or municipality; and certifies that all the above information is accurate,
DATE SIGNED
APPROVAL CONDITIONS This permit is issued pursuant to the following conditions, Failure to comply may result in suspension or
revocation of this permit or other penalty
SEE "STANDARD CONDITIONS OF APPROVAL" SHEET
D Village 0 City D County D State of:
City Of Oshkosh
Municipality Number of Dwelling Location:
7 0 2 6
Inspection
Wis, Permit Seal
Other
Total
5BD-5823 (R. 07/92)
$30.00
,f Construction
D HVAC
D Electrical
D Plumbing
o Erosion
D
Name JOHN ZARATE
Date 10/18/2007
$105,00
381602
Cert, No, 70330
a t
, .�NED
�� ��
CITY OF OSHKOSH N�`�� �
STANDARD CONDITIONS OF APPROVAL °
Project Address_ Z8� f�-!�'.S'T�AD L7►� Permit# �
�
� Please read the following information and sign at the bottom to acknowledge that you have read
and agree to comply with these conditions. ...
1. All habitable rooms must be provided with 8%light and 3.5%ventilation. Bedrooms
located on the second floor or below ground level must be provided with egress windows
in addition to the light and ventilation requirements. Basement windows aze also required
to have window well areas in accordance with COMM 21.03.
Z. Garage spaces shall be sepazated from the dwelling unit in accordance with COMM
21.08. The door and frame assembly between the dwelling unit and an attached gazage
shall be labeled by an independent testing a ency as having a minimum fire-resistive
rating of 20 minutes. All drywall joints are required to be taped/sealed unless the
joints are fitted so that the gap is no more than a dimes thickness( 1/20-inch) and
backed by solid wood or drywall with the joints staggered.
; 3. All penetrations in exterior walls must be sealed prior to the insulation inspection. This
� includes holes in the top and bottom plates, slits and holes in electrical boxes, gaps
� azound heating ducts, and holes in the return air spaces. '
4. Smoke detectors are required on every floor and within 6'of a11 bedrooms. The smoke
detectors are required to be hardwired and interconnected with battery back-up.
5. Hydromassage tubs are required to have an access panel to the motor. The access panel
must be accessible without removing the finish of the house.
6. The truss manufacturer must design all over&aming, according to standards set by the
truss plate institute, or structural calculations must be provided prior to the mugh building
inspection.
7. Truss plans must be submitted and approved prior to framing the roof.
8. Truss plans including the truss layout must be provided on site at the rough building
inspection. In addition to the truss plans,micmlam calculations must be provided on site
at the rough building inspection for all microlazns with point loads on them.
9. Column caps aze to be designed to ensure adequate beam bearing,provide a positive -
connection to the beam without splitting the member, and provide lateral restraint.
� I:\Inapectiona\FOrma\Printed Forms\Standard Conditiona of Approval Rev 11-06.doc
t
�
�
5
# r . �
; , �.�NF4
� ��p�
� 10. The property owner and applicant is responsible for compliance with COMM 21.125 DP�`'
�
� (Erosion Control). When installing access drives, a minimum of 2"-3" diameter stone is
� required in addition to a minimum of 6" depth, 30'-50'length, and 14'-20'width. Erosion
� control measures must be maintained until the lawn is established.
� 11. All storm sewer inlets must be protected with approved erosion control devices. Tracking
� (i.e. sediment)must be removed from-the street at the end of each workday. .Repair any.
siltahon or erosion damage to adjouung surfaces and drainageways resultuzg from land
� development or disturbing activities.
#
� 12. The building placard must be posted on site at all times. Once the rough framing is up
` the placard must be posted on the patio door or on a kitchen window. ffthe placazd is not
� present at any inspection, stop work orders will be posted. Additional placards can be
� obtained through our department if the cazds are misplaced. �
F
�
j 13. All mechanicals must be roughed in prior to requesting the rough building inspection. If
� on the inspection the mechanicals are not roughed in,the inspection will fail and a$100
; re-inspection fee will be charged.
14. Attached is a copy of the final inspection checklist. At the final inspection all items on
this list must be completed to avoid the$100 re-inspection fee per inspection.
15. Appliances such as ttie stove,refrigerator,washer, and dryer are not to be set in place due
to the electrical inspector needing to look at the power serving the appliances;
16. A 6'stepladder must be on site at the final inspection to provide access to the attic.
17. When requesting final inspections please note that a minimum of 2 days notice is needed
from the time the inspection is ready. At the final inspection no furniture or personal
belongings are allowed in the dwelling. If occupancy is required prior to the completion
of the house the applicant/owner is required to submit an application for a Temporary
Occupancy Permit along with the required fees. A Temporary Occupancy may be
approved provided that all health and safety issues are complete and approved.
' 18. The building placazd must remain on the patio door or on a kitchen window until
occupancy is approved. Occupancy is not allowed prior to the placard having all of the
final inspection approved stickers on the backside. If occupancy occurs prior to the
inspections being approved daily citations will be issued with no further notice being
given.
19. All site grading must be done in accordance with the approved drainage plan on file in the
public works office,3rd floor.
Signature of Applicant: �. Date:
I:\Inapections\FOrms\Printed Forms\Standard Conditiona of Approval �tev 11-06.doc
t