Loading...
HomeMy WebLinkAbout0127541-Building e OSHKOSH ON THE WATER Job Address 2875 HOMESTEAD DR CITY OF OSHKOSH No 127541 BUILDING PERMIT - APPLICATION AND RECORD Owner RUSCH HO~~~~f_______ Create Date 10/18/2007 Designer Contractor RUSCH HOMES LLC Category t1.9-=-_(\jEO"':' Sinj;l~J::~mily Plan 051-1007 Type ._~~i'9~_____D Si9!.:'_ ___O_f~noeL______Di~r:~El______ _.__0 Ra~~._ Zoning R-1 Class of Const: 8 Size IrrL.____._ Bedrooms 5 3 Height 18 Ft. O_~roj~ction J Canopies Unfinished/Basement 1302 Sq. Ft. Finished/Living _. 1302 Sq. Ft. Rooms Stories Signs Garage ~ Sq.Ft. Baths 2 Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit ~~9uirEl~____ Occupancy Fee $0.00 Flood Plain No Height Permit Not_REl_C1uired Park Dedication f:'J~L!35lqu~~._ # Dwelling Units # Structures Use/Nature [NSFRTNew-smgJefamify*Tstory:2carattachedgarag-e-and13'x'15'patio_' The driveway will be 20' wide. of Work ; .-.----.-------j HVAC Contractor CONDON TOTAL COMFORT Plumbing Contractor PLUMBING CONTRACTOR SPECIALIST Electric Contractor CUMINGS ELECTRIC INC $100,000.00 Plan Approval __.__~_?~OO Permit Fee Paid $418.00 Park Dedication $0.00 Fees: Valuation Issued By: Date 1 0/29/2007 FinaIlO.P. .22~00/QgQg D _-,=-ermit V~i9~~ Parcelld # 1341950000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure ~ R ovals before starting such activity. Signature tI-c..-t Date Agent/Owner Address POBOX 423 OMRO WI 54963 - 0000 Telephone Number 685-0241 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. ~Ot \ C{I' vY- \ ~~o 1 '('\ \ e- ) 13~15 PATIO IS' 1'31 f)!;t jq' xY>f :27' 1'1' I I 69.1 g' I dJI ,P,4tl1NIo r PA-D 30' r ',,1\,' ' 'i /1"\' J.<t7" H~ l ~6' t OCT 1 6 2007 \i1l, ~ ~ DEPARTf'1ENT OF COiv'iMUNlTY DEVELOP~~ENT INSPECTION SERVICES DIVISION Wisconsin Department of Industry, Labor and Human Relations Safety and Buildings Division P,O, Box 2509 Madison, WI 53701-2509 Wisconsin Statues 101.63, 101.73 WISCONSIN UNIFORM BUILDING PERMIT APPLlCA TION Application No, 0127541 Parcel No. D Constr Plbg Lic/Cert # 879882 Plbg Lic/Cert # 170792 Plbg Lic/Cert # 3202 Lic/Cert # 230863 D HVAC DElee Mailing Address PO BOX 423 Mailing Address POBOX 423 Mailing Address PO BOX 749 Mailing Address PO BOX 184 Mailing Address 1226 CHELSEA CT D Plbg o Erosion D Other: Telephone No, OMRO WI 54963 - 0423 Telephone No, OMRO WI 54963 - 0 685-0241 Telephone No. NEENAH WI 54957 - 749 920-231-5946 Telephone No, RIPON WI 54971 _ 184 920-748-5050 Telephone No. MENASHA WI 54952 - 0 920-749-9121 1/4,Section ,T N,R E(or)W Lot No, Block No, Building Address 2875 HOMESTEAD DR Zoning District(s) S ,ft. 1/4, Subdivision Name Forced Air Furnace D Radiant Baseboard or Panel D Heat Pump D Boiler D Central Air Conditioning Other Nat. L.P, Oil Elec. Solid Gas Space Htg 0 D D D D D Water Htg 0 D D D D D Dwelling unit will have 3 kilowatt or more installed electric space heating equip, Infiltration control option is: D Full sealing of joints, D Blower door test. D Exterior air infiltration barrier. 1302 Living Area Garage _ 1302 -.---- 462 o Plus Basement The applicant agrees to comply with all applicable code , s the permit creates no legal liability, express o~ n APPLICANT'S SIGNATURE ~"';;""A o Municipal Utility D Private On-Site Well s and ordinances and with the conditions of this permit, understands that the issuance of epartment or municipality; and certifies that all the above information is accurate, DATE SIGNED APPROVAL CONDITIONS This permit is issued pursuant to the following conditions, Failure to comply may result in suspension or revocation of this permit or other penalty SEE "STANDARD CONDITIONS OF APPROVAL" SHEET D Village 0 City D County D State of: City Of Oshkosh Municipality Number of Dwelling Location: 7 0 2 6 Inspection Wis, Permit Seal Other Total 5BD-5823 (R. 07/92) $30.00 ,f Construction D HVAC D Electrical D Plumbing o Erosion D Name JOHN ZARATE Date 10/18/2007 $105,00 381602 Cert, No, 70330 a t , .�NED �� �� CITY OF OSHKOSH N�`�� � STANDARD CONDITIONS OF APPROVAL ° Project Address_ Z8� f�-!�'.S'T�AD L7►� Permit# � � � Please read the following information and sign at the bottom to acknowledge that you have read and agree to comply with these conditions. ... 1. All habitable rooms must be provided with 8%light and 3.5%ventilation. Bedrooms located on the second floor or below ground level must be provided with egress windows in addition to the light and ventilation requirements. Basement windows aze also required to have window well areas in accordance with COMM 21.03. Z. Garage spaces shall be sepazated from the dwelling unit in accordance with COMM 21.08. The door and frame assembly between the dwelling unit and an attached gazage shall be labeled by an independent testing a ency as having a minimum fire-resistive rating of 20 minutes. All drywall joints are required to be taped/sealed unless the joints are fitted so that the gap is no more than a dimes thickness( 1/20-inch) and backed by solid wood or drywall with the joints staggered. ; 3. All penetrations in exterior walls must be sealed prior to the insulation inspection. This � includes holes in the top and bottom plates, slits and holes in electrical boxes, gaps � azound heating ducts, and holes in the return air spaces. ' 4. Smoke detectors are required on every floor and within 6'of a11 bedrooms. The smoke detectors are required to be hardwired and interconnected with battery back-up. 5. Hydromassage tubs are required to have an access panel to the motor. The access panel must be accessible without removing the finish of the house. 6. The truss manufacturer must design all over&aming, according to standards set by the truss plate institute, or structural calculations must be provided prior to the mugh building inspection. 7. Truss plans must be submitted and approved prior to framing the roof. 8. Truss plans including the truss layout must be provided on site at the rough building inspection. In addition to the truss plans,micmlam calculations must be provided on site at the rough building inspection for all microlazns with point loads on them. 9. Column caps aze to be designed to ensure adequate beam bearing,provide a positive - connection to the beam without splitting the member, and provide lateral restraint. � I:\Inapectiona\FOrma\Printed Forms\Standard Conditiona of Approval Rev 11-06.doc t � � 5 # r . � ; , �.�NF4 � ��p� � 10. The property owner and applicant is responsible for compliance with COMM 21.125 DP�`' � � (Erosion Control). When installing access drives, a minimum of 2"-3" diameter stone is � required in addition to a minimum of 6" depth, 30'-50'length, and 14'-20'width. Erosion � control measures must be maintained until the lawn is established. � 11. All storm sewer inlets must be protected with approved erosion control devices. Tracking � (i.e. sediment)must be removed from-the street at the end of each workday. .Repair any. siltahon or erosion damage to adjouung surfaces and drainageways resultuzg from land � development or disturbing activities. # � 12. The building placard must be posted on site at all times. Once the rough framing is up ` the placard must be posted on the patio door or on a kitchen window. ffthe placazd is not � present at any inspection, stop work orders will be posted. Additional placards can be � obtained through our department if the cazds are misplaced. � F � j 13. All mechanicals must be roughed in prior to requesting the rough building inspection. If � on the inspection the mechanicals are not roughed in,the inspection will fail and a$100 ; re-inspection fee will be charged. 14. Attached is a copy of the final inspection checklist. At the final inspection all items on this list must be completed to avoid the$100 re-inspection fee per inspection. 15. Appliances such as ttie stove,refrigerator,washer, and dryer are not to be set in place due to the electrical inspector needing to look at the power serving the appliances; 16. A 6'stepladder must be on site at the final inspection to provide access to the attic. 17. When requesting final inspections please note that a minimum of 2 days notice is needed from the time the inspection is ready. At the final inspection no furniture or personal belongings are allowed in the dwelling. If occupancy is required prior to the completion of the house the applicant/owner is required to submit an application for a Temporary Occupancy Permit along with the required fees. A Temporary Occupancy may be approved provided that all health and safety issues are complete and approved. ' 18. The building placazd must remain on the patio door or on a kitchen window until occupancy is approved. Occupancy is not allowed prior to the placard having all of the final inspection approved stickers on the backside. If occupancy occurs prior to the inspections being approved daily citations will be issued with no further notice being given. 19. All site grading must be done in accordance with the approved drainage plan on file in the public works office,3rd floor. Signature of Applicant: �. Date: I:\Inapections\FOrms\Printed Forms\Standard Conditiona of Approval �tev 11-06.doc t