Loading...
HomeMy WebLinkAbout0127531-Building (roof) e OSHKOSH ON THE WATER Job Address 1707 CHESTNUT ST CITY OF OSHKOSH No 127531 BUILDING PERMIT - APPLICATION AND RECORD Owner GARY E/DORRY A WILNER Create Date 10/29/2007 Contractor BOB GRIFFIN CARPENTRY Designer Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. o Projection I Finished/Living Sq.Ft. Sq.Ft. Bedrooms Stories Canopies Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature FRI Exterior remodeling' to include installing a pitch roof over 2 existing flat roof areas (14' x 16' & 14' x 30'). All work shallfeomplyWITh' of Work pplicable building codes. . HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $3,800.00 Plan Approval $0.00 Permit Fee Paid $46.00 Park Dedication $0.00 Issued By: ~ Date 10/29/2007 Final/O.P. 00/00/0000 o Permit Voided I Parcelld # 1512490000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to see e anyecess a.QPr v ~efore starting such activity. Signature ? rfl'" Date \/ cJ '1-'1-I1? Agent/Owner Address 1955 SKYRANCH AVE OSHKOSH WI 54904 - 0000 Telephone Number 235-4153 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.