October 26, 2007
James Leedum
Sigma Development
1300 West Canal Street
Milwaukee, WI 53233
Ref: Plumbing Plan Approval:
Yum Brands, Inc I A & W Restaurants
2187 W. 9th Ave. Oshkosh, WI
Plan 10# ZZ2-279-1007-P
Dear Sirs,
Examination of the plumbing plans and specifications for this project has been completed. In
accord with Chapter 145, Wisconsin Statute, and COMM 81 through 85, Wisconsin
Administrative Code, the plumbing plans and specifications are approved contingent upon
compliance with the stipulation(s) noted below.
1. No horizontal dry vent connection allowed below the midline of the drain served
COMM 82.31
2. The three compartment scullery sink shall be direct connected to the drain vent
system per COMM 82.32
3. The containment reduced pressure principal back flow preventer shall be registered
with the Department in Madison, the device is not required by state or local
regulations per COMM 82.20, but if installed shall be tested at least annually and
reports filed with the test results.
4. Installation of a pressure boost pump requires a low pressure supply side energy cut
off be installed per COMM 82.40
5. The installation of one full size stack extended undiminished in size to the roof is
required under COMM 82.31 for each building sewer installed.
6. Building sanitary sewer shall be accessible by clean out so that no more than 100
feet of developed length exists between full size clean out access per COMM 82.35
7. Exterior sewer c1eanouts installed in areas subject to vehicular traffic shall terminate
in a concrete pad per COMM 82.35
In the event installation of this plumbing system has not commenced within two years from this
date, this approval shall become void. A new application accompanied by full examination
fees shall be filed and an updated approval received before work may 'commence.
In granting this approval, the City of Oshkosh or its representative does not hold itself liable for
any defects in plans or specifications, plan omissions, examination oversight, construction or
s~
any damage that may result in or after installation. The City of Oshkosh reserves the right to
order changes or additions should conditions arise making this necessary. It shall be
necessary for the installing plumber to obtain a plumbing permit from the City of Oshkosh
before proceeding with actual installation of this plumbing system or any of its parts.
Respectfully,
Richard Wood I
Plumbing Inspector