HomeMy WebLinkAbout0127485-Building (garage addition)
..'~
OSHKOSH
ON THE WATER
Job Address 375 NEAGLE ST
CITY OF OSHKOSH No 127485
BUILDING PERMIT - APPLICATION AND RECORD
Owner OSH AREA SCHL DIST WEST HIGH Create Date 10/25/2007
Designer
Contractor OWNER
Category
228 - Addition Schools & other Educational Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement
Sq.Ft.
Sq.Ft.
Rooms
Height Ft.
o Projection I
Fi nished/Livi ng
Bedrooms
Stories
Canopies
Garage
Sq.Ft.
Baths
Signs
Foundation
. Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier
o Treated Wood
o Other
Occupancy Permit Not Required
Occupancy Fee
$0.00 Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# DW,elling Units
o
# Structures
o
Use/Nature School/ Construct 7' wicTeaddition -to garage, and re-shingle the existing roof.
of Work
HV AC Contractor
Plumbing Contractor
Electric Contractor
,000.00 Plan Approval
$0.00 Permit Fee Paid
$39.00 Park Dedication
$0.00
Issued By:
Date 10/25/2007
FinaIlO.P. 00/00/0000
o Permit Voided I
Parcel Id # 1608720100
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessa approvals before starting such activity.
Signature
Date
Jc/zslo7
Address PO BOX 3048
Agent/Owner
OSHKOSH
WI 54903 - 3048 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.