Job Address 944 DOVE ST
CITY OF OSHKOSH
No
0075069
BUILDING PERMIT - APPLICATION AND RECORD
Owner
STEN ANDERSON
Create Date
01/12/2000
Designer
Contractor OWNER
Category
141 - Exterior Remodeling Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Sq. Ft.
Sq.Ft.
Sq.Ft.
Rooms
Height
Ft.
D Projection I
Unfinished/Basement
Finished/Living
Bedrooms
Stories
Canopies
Garage
Baths
Signs
Foundation
Poured Concrete 0 Floating Slab
Concrete Block 0 Post
o Pier
o Treated Wood
o Other
Occupancy Permit Required
Flood Plain
Height Permit
# Dwelling Units
o
# Structures
o
Park Dedication
Use/Nature SFRI PERMIT EXTENSION/ All items remaining for this project which are detailed in the letter dated 1/6/00. The remaining violations
of Work are required to be completed and approved by 4/28/99.
HV AC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuati~n tP-1 1 $2,000.00 Plan Approval
Issued By: ~
$0.00 Permit Fee Paid
$15.00 Park Dedication
$0.00
Date 01/12/2000
Final/O.P.
D Permit Voided I
I n the perfor
f this work I agree to perform all work pursuant to rules governing the described construction.
Signature
Date
Address
Agent/Owner
OSHKOSH
WI 54902 - 0000
Telephone Number
>
,
..
~ I'
~
~
OJHKOfH
City of Oshkosh
Division of Inspection Services
215 Church Avenue
PO Box 1130
Oshkosh WI 54902-1130
ON THE WATER
January 6, 2000
STEN ANDERSON
944 DOVE ST
OSHKOSH WI 54901
RE: Violations at 944 Dove St.
Dear Mr. Anderson,
Our office has reviewed the timeline submitted for the required repairs at 944 Dove St. Although we
have not received a written request asking for an extension on your building permit, our office is
assuming the timeline is your request to continue to repair this structure. According to your timeline the
following orders will be complete and approved by:
1. Electrical final approved by 1/17/99
2. Bathroom door installed by 1/17/99
3. The furnace installation and required clearances to the b-vent by 1/17/99
4. Secure gas line for the water heater by 1/17/99
5. All draftstopping and firestopping by 1/17/99
6. All siding, soffit, and fascia installed by 3/31/99
7. Enclosing and venting of the crawlspace by 3/31/99
8. Sidewalk poured and uniform risers for the entrance by 3/31/99
9. Roofrepairs for the front porch, re-roofing entire house, and venting the attic by 4/28/99
The above referenced orders are required to be completed and inspected for approval by the dates you
submitted. A raze order will be issued if the items are not completed by the deadlines listed above.
Please note continued occupancy ofthis structure violates section 7-31 and 7-32 of the Municipal Code
and will constitute daily citations.
Please apply for the required building and electrical permit within the next 10 days. If you have any
questions feel free to contact me at 236-5036.
Sincerely,
^)~~
Nicole Krahn
Building Inspector