HomeMy WebLinkAbout2007-Plumbing ZZ2-278-1007-P
~
OJHKOJH
City of Oshkosh
Inspection Services
215 Church Ave., PO Box 1130
Oshkosh, WI 54902-1130
(920) 236-5052 (920) 236-5184 FAX
ON THE WATER
October 23, 2007
Hurckman Mechanical
1450 Velp Ave.
Green Bay, WI 54303
Ref: Plumbing Plan Approval:
Bergstrom Subaru (interior plumbing)
3325 S. Washburn St. Oshkosh, WI
Plan I D# ZZ2-278-1 007-P
Dear Sirs,
Examination of the plumbing plans and specifications for this project has been completed. In
accord with Chapter 145, Wisconsin Statute, and COMM 81 through 85, Wisconsin
Administrative Code, the plumbing plans and specifications are approved contingent upon
compliance with the stipulation(s) noted below.
1. Horizontal branch building drain connection downstream from the base of a 2" or
larger drain stack shall be made in the top quadrant of the drain or installed with a
minimum of 10 pipe diameters between the branch wye fitting and the base of the
drain stack per COMM 82.30
2. Only fixtures of one dfu or less shall discharge into the circuit vented branch per
COMM 82.31
In the event installation of this plumbing system has not commenced within two years from this
date, this approval shall become void. A new application accompanied by full examination
fees shall be filed and an updated approval received before work may commence.
In granting this approval, the City of Oshkosh or its representative does not hold itself liable for
any defects in plans or specifications, plan omissions, examination oversight, construction or
any damage that may result in or after installation. The City of Oshkosh reserves the right to
order changes or additions should conditions arise making this necessary. It shall be
necessary for the installing plumber to obtain a plumbing permit from the City of Oshkosh
before proceeding with actual installation of this plumbing system or any of its parts.
Respectfu lIy,
Richard Wood,
Plumbing Inspector