Loading...
HomeMy WebLinkAbout0127437-Building (stone facade) G OSHKOSH ON THE WATER Job Address 404 NEAGLE ST CITY OF OSHKOSH No 127437 BUILDING PERMIT - APPLICATION AND RECORD Owner MARVIN FNERNA M SUMMERVILLE Create Date 10/23/2007 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Class of Const: Size Rooms Height Ft. D Projection I Bedrooms Stories Canopies Baths Signs Zoning Unfinished/Basement Sq.Ft. Finished/Living Sq.Ft. Sq.Ft. Garage Foundation 0 Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier . Other o Treated Wood Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit # Dwelling Units o # Structures o Park Dedication Use/Nature ~FRf Reinstall Lannon Stone facade on front face of the building." Remove, properly prepare the subsurface, install flashing where of Work needed and reinstall stone. " JK Masonry is contractor, HV AC Contractor Plumbing Contractor Electric Contractor $1,200.00 Plan Approval $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 Fees: Valuation Issued By: Date 10/23/2007 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1609230000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and ~.:~cur~}",ecessary approva~s bef re starting such activity. Signature ~ ........ Date / C/-;(' :?-o 7' /'. - Agent/Owner Address 404~ EAGLE ST OSHKOSH WI 54902 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.