Loading...
HomeMy WebLinkAbout0127414-Building (fence) G OSHKOSH ON THE WATER Job Address 1515 BEECH ST CITY OF OSHKOSH No 127414 BUILDING PERMIT - APPLICATION AND RECORD Owner TIMOTHY J BOSTWICKlTAMARA E TAKACS Create Date 10/23/2007 Designer Contractor OWNER Category 251 - Fences Plan Type o Building o Sign o Canopy . Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq.Ft. Rooms Height Ft. Finished/Living Sq.Ft. Bedrooms Stories - Garage Sq.Ft. Baths - Foundation . Poured Concrete 0 Floating Slab o Pier o Other o Concrete Block o Post o Treated Wood Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 o Projection I Canopies Signs Use/Nature SFRllnstalling approx. 64' of 6' high wood privacy fence along the side lot line. . of Work HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation Issued By: ~ $600.00 Plan Approval $0.00 Permit Fee Paid $25.00 Park Dedication $0.00 Date 10/23/2007 Final/O.P. 00/00/0000 o Permit Voided I Parcelld # 1207930000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to s0Y nece ry approvals before starting such activity. Signature Address 1515 BEECH ST Agent/Owner OSHKOSH DatelL:? rfJ'- Z:l-a 7 / WI 54901 - 2805 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (I.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.