HomeMy WebLinkAbout0127313-Plumbing
e CITY OF OSHKOSH No 127
OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 1325 S WESTHAVEN DR Owner ANJISHNU K ROY Create Date 10/16/2007
Contractor WATTERS PLUMBING
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature Seal water and sanitary to raze building. Install interior plumbing in NSFR to be built using existing sewer and water.
of Work
Valuation
Issued By
2 Shower
1 Floor Drain
6 Lndry Tray
5 Disposal
1 Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
2 silcocks
2 Water Softner
1 Local Waste
Clothes Wshr
1 Bidet
1 Beer Tap
2 Lab Sink
Sterilizer
Dip Well
Drink Ftn
Sanitary Sewer
Size
Storm Sewer
Water Service
$14,375.00 Plan Approval
Category 410 - Residential-I nterior
Wait. St.
Ice Chest
2 Exam Sink
Sculry Sink
Hand Sink
Plaster Sink
Surgeons Sink
F Prep Sink
Serv Sink
Material
$0.00 Permit Fees
Plan
Shamp Sink
Flr/Wst Sink
Catch Basin
Wash Ftn
Urinal'
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
2 Wtr Sewer Mtrs
Deduct Meters
Standp Rec
Ice Maker
Gar Drain
Wtr Usage Mtrs
Soda Disp
Type
#
Conn. Type
Parcelld #
1312650100
$203.00 D Permit Voided I
Date 10/17/2007
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address PO BOX 118
MENASHA
WI 54952 - 0118 Telephone Number 920-733-8125
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.