Loading...
HomeMy WebLinkAboutPW CNT 07-04/Cng Order #1 City of Oshkosh Department of Public Works 215 Church Avenue P.O. Box 1130 Oshkosh, Wisconsin 54903-1130 ~ OfHKOfH ON THE WATER (920) 236-5065 ~'~"~"''-' .......""""'''--'''''"'''''''''''''''''~'''''''......~''''.'.-..._-,. October 11, 2007 Mr. Lyle Wettstein Vinton Construction P.O. Box 1987 Manitowoc, WI 54221-1987 Re: Change Order #1/Contract 07-04 Dear Mr. Wettstein: Enclosed please find an executed copy of the Change Order between the City of Oshkosh and Vinton Construction regarding the above-mentioned project. If you have any questions, please call our office at (920) 236-5065. Thank you. Sincerely, i5~ c. '--f>~/~ David C. Patek Director of Public Works DCP/c1rn Enclosure cc: Pam Uhrig, City Clerk (w/original) Warren Kraft, City Attorney (w/copy) File Copy (w/original) .,..' ~:!!! ,- CHANGE ORDER # 1 DATED: SEPTEMBER 21,21007 TO: Vinton Construction Co. PO Box 1987 Manitowoc, WI 54221-1987 Your present contract with the City of Oshkosh, Contract No. and changed as follows: 07 -04 , is hereby amended NET INCREASE TO: SECTION II - STORM SEWER NET INCREASE TO: : SECTION III - SANITARY SEWER NET INCREASE TO: SECTION IV - WATER MAIN $17,063.18 $25,194.38 $109,735.05 NET INCREASE TO CONTRACT: $151,992.61 Recommended: I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. ~.lA~.~ Comptroller CONTRACT: 07-04 CHANGE ORDER # 1 ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION II - STORM SEWER ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECF?EASE IN DESCRIPTION CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 238 Furnish and install approx. 30 linear feet of 30" storm sewer, complete as specified, per linear foot 30.00 30.00 $59.36 $1,780.80 239 Abandon approx. 23 linear feet of 6" storm sewer, complete as specified, per linear foot 23.00 23.00 $9.00 $207.00 240 Furnish and install approx. seven (7) linear feet of 36" storm sewer, complete as specified, per linear foot 7.00 7.00 $95.70 $669.90 241 Additional labor, equipment, and materials to remove and dispose of existing concrete cap on storm sewer on E. Irving Ave. from Hazel St. to Oak St., per invoice #6332, lump sum 1.00 1.00 $10,115.00 $10,115.00 242 Additional labor, equipment, and materials to repair existing storm manhole on Lark St., per invoice #6347, lump sum 1.00 1.00 $857.80 $857.80 243 Additional labor, equipment, and materials to remove and backfill concrete structure on Iowa St., per invoice #6366, lump sum 1.00 1.00 $2,079.14 $2,079.14 244 Additional labor, equipment, and materials to relocate inlets G5 & G6., per invoice #6371, lump sum 1.00 1.00 $1,353.54 $1,353.54 ADDITIONAL WORK: C.O. # - (ITEMS 238 - 244). SUB-TOTAL $17,063.18 $0.00 NET INCREASE TO: SECTION II - $17,063.18 Page 1 .. i I CONTRACT: 07-04 CHANGE ORDER # 1 ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION 11I- SANITARY SEWER ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PFlICE 337 Additional labor and equipment to relay sanitary sewer lateral @ 350 W. 17th Ave., due to poor condition, per invoice #6211, lumo sum 1.00 1.00 $1,395.00 $1,395.00 338 Additional labor and equipment to relay sanitary sewer lateral @ 340 W. 17th Ave., due to poor condition, per invoice #6212, lumo sum 1.00 1.00 $598.00 $598.00 339 Additional labor and equipment to relay sanitary sewer lateral @ 330 W. 17th Ave., due to poor condition, per invoice #6213, lump sum 1.00 1.00 $1,143.50 $1,143.50 340 Additional labor, materials, and equipment to remove existing sanitary sewer on E. Irving Ave. from Evans St. to Bowen St., per invoice #6333, lump sum 1.00 1.00 $9,515.25 $9,515.25 341 Additional labor, materials, and equipment to install betonite dams in sanitary lateral trenches at 14 locations on Lark St. and Arthur Ave., due to high ground water, per invoice #6346, lumo sum 1.00 1.00 $9,121.65 $9,121.65 342 Additional labor, materials, and equipment to fill existing tunnel around sanitary sewer at Adams Ave. and Lark St. intersection with slurry backfill, per invoice #6348, lumo sum 1.00 1.00 $605.48 $605.48 343 Additional labor, materials, and equipment to investigate and repair sanitary lateral at 1114 E. Irving Ave, that was damaged by WPS boring of gas main, per invoice #6355, lumo sum 1.00 1.00 $2,815.50 $2,815.50 ADDITIONAL WORK: C. O. # 1 - (ITEMS 337 - 343) - SUB-TOTAL $25,194.38 $0.00 NET INCREASE TO: SECTION III- $25,194.38 Page 2 . '" . ..' CONTRACT: 07-04 CHANGE ORDER # 1 SECTION IV - WATER MAIN ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PH/CE 404 Furnish and install approx. 500 linear feet of 12" Ductile Iron Water Main w/poly wrap, complete as specified (fittings not included), per linear foot 500.00 1,574.00 1,074.00 $85.40 $91,719.60 SECTION IV - (BID ITEM 404) - SUB-TOTALS $91,719.60 $0.00 ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION IV - WATER MAIN ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECflEASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 448 Furnish and install approx. six (6), 6" - 22.5 degree bends, complete as soecified, each 6.00 6.00 $179.00 $1,074.00 449 Furnish and install approx. one (1), 8" x 8" cross, complete as specified, each 1.00 1.00 $893.50 $893.50 450 Furnish and install approx. one (1), 10" Sleeve, complete as specified, each 1.00 1.00 $783.50 $783.50 451 Furnish and install approx. one (1),8" x 12" MJ solid sleeve, complete as soecified, each 1.00 1.00 $449.50 $449.50 452 Furnish and install approx. five (5), 12" valves, complete as specified, each 5.00 5.00 $1,917.00 $9,585.00 453 Furnish and install approx. one (1), 12" - 90 degree bend. complete as specified. each 1.00 1.00 $425.00 $425.00 454 Furnish and install approx. one (1), 8" x 12" reducer, complete as specified, each 1.00 1.00 $300.00 $300.00 Page 3 7 ~.:. :; CONTRACT: 07-04 CHANGE ORDER # 1 455 Furnish and install appro~. eight (8),4" solid sleeves, complete as specified, each 8.00 8.00 $120.00 $960.00 456 Furnish and install approx. one (1), 8" solid sleeve, complete as specified, each 1.00 1.00 $196.80 $196.80 457 Furnish and install approx. one (1), 8" 11.25 degree bend, complete as soecified, each 1.00 1.00 $243.00 $243.00 458 Furnish and install approx. three (3), 6" plugs, complete as specified, each 3.00 3.00 $100.00 $300.00 459 Additional labor and equipment to replace broken water valve on Atlas Ave., per invoice #6326, lump sum 1.00 1.00 $193.50 $193.50 460 Additional labor and equipment to replace broken water valve on Atlas Ave., per invoice #6327, lump sum 1.00 1.00 $193.50 $193.50 461 Additional labor, equipment, and materials to repair water service, which was damaged by contractor due to no locate marks by city, per invoice #6372, lumo sum 1.00 1.00 $2,418.15 $2,418.15 ADDITIONAL WORK: C.O. # 1 (ITEMS 448 - 461) - SUB-TOTAL $18,015.45 $0.00 $109,735.05 NET INCREASE TO: SECTION IV - NET INCREASE TO SECTIONS II, III, IV NET DECREASE TO SECTIONS II, III, IV $151,992.61 $0.00 $151,992.61 NET INCREASE TO CONTRACT: Page 4