HomeMy WebLinkAbout0127300-Building
o
OSHKOSH
ON THE WATER
Job Address 5 E WAUKAU AVE
CITY OF OSHKOSH No 127300
BUILDING PERMIT - APPLICATION AND RECORD
Owner KURT & JUDIE KOEPPLER Create Date 10/12/2007
Contractor D B CURTISS L TO
Designer
Category
130 - New Multi-Family Plan Z7-2147-1007
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement
Sq.Ft.
Sq.Ft.
Rooms
Height
Ft.
D Projection I
Canopies
Signs
Finished/Living
Bedrooms
Stories
Garage
Sq.Ft.
Baths
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit Required
Occupancy Fee
$0.00 Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Dwelling Units
6
# Structures
Use/Nature . !COMM/ 6 unit multifamily building. Two units are located on the first level and 4 units are located on the 2'ld level. All units have
of Work ttached garages. State approval #1432293, Site 10# 729289.
HV AC Contractor
CONOONTOTALCOMFORT
Plumbing Contractor WATTERS PLUMBING
Electric Contractor SCHOMMER ELECTRICAL CONTRACTING I
$226,000.00 Plan Approval
$0.00 Permit Fee Paid
$766.00 Park Dedication
Fees: Valuation
$0.00
Issued By:
Date 10/16/2007
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld #
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit ion within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) an to secure sary approvals before starting such activity.
Signature
Agent/Owner
OSHKOSH
WI 54902 - 6036
D'~~
Telephone Number
Address 40 W 6TH AVE
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.