HomeMy WebLinkAbout0127274-Building
G
OSHKOSH
ON THE WATER
Job Address 2003 MOUNT VERNON ST
CITY OF OSHKOSH
No
127274
BUILDING PERMIT - APPLICATION AND RECORD
Owner JAMIE ANDERSON/JASON WOLFGRAM
Create Date
10/15/2007
Designer
Contractor TIM MCBRAIR
Category
161 - Wrecking Residential Dwellings Plan
Type
. Building
o Sign
o Canopy o Fence o Raze
Class of Const: Size
Rooms Height Ft. o Projection I
Bedrooms Stories Canopies
Baths Signs
Zoning
Unfinished/Basement
Sq.Ft.
Finished/Living
Sq.Ft.
Garage
Sq.Ft.
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit Not Required
Occupancy Fee
$0.00 Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Dwelling Units
o
# Structures
o
Use/Nature RAZEl Raze eXistingdwelnng unit in preparation for new home to be constructed. All materials r!!;quired to be proper"ly dlspr,$eci'of.
of Work
HV AC Contractor
Plumbing Contractor
Electric Contractor
Issued By:
2,800.00 Plan Approval
$0.00 Permit Fee Paid
$39.00 Park Dedication
$0.00
Fees: Valuation
Date 10/15/2007
Final/O.P. 00/00/0000
o Permit Voided I
Parcelld # 1515420000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to se r any ne essary a before starting such activity.
~ I ~
Signature .. V'
Agent/OWner
Oshkosh
WI 54901 - 9787
Date 10 - /5 -D '7
377-1/f) 1
Telephone Number 7~/ 231-3146
Address
3760 PARKVIEW CT
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.