Loading...
HomeMy WebLinkAbout0127276-Building G OSHKOSH ON THE WATER Job Address 280 E FERNAU AVE CITY OF OSHKOSH No 127276 BUlbDING PERMIT - APPLICATION AND RECORD Owner JAY & PETER SCHABLOSKI/JUNE MACADAII. Create Date Contractor STODOLA-MAAS CONSTRUCTION 10/12/2007 Designer Thomas Karrels Category 210 - Addition Industrial Plan Z4-2078-0807 Type . Building o Sign o Canopy o Fence o Raze Class of Const: 3B Size 3200 sq ft Rooms Height Ft. o Projection I - Bedrooms Stories Canopies Baths Signs - Zoning Unfinished/Basement Sq.Ft. Finished/Living Sq.Ft. Garage Sq.Ft. Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Required Occupancy Fee $0.00 Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units o # Structures o Use/Nature IND/ Construbt3200 sq. ft. addition as per plans. of Work HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation . 0 Plan Approval $0.00 Permit Fee Paid $505.00 Park Dedication $0.00 Issued By: Date 10/15/2007 FinaIlO.P. 00/00/0000 o Permit Voided I Parcelld # 1519603200 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit ap!;llication within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to s.~~.t~;~cessp provalt!?ef~~~rting suc~ activity. .: _ . Signature /) - / 'f' ~A v Date /0 /~Q ) Agen Address BOX 1357 FOND DU LAC WI 54936 - 1357 Telephone Number 920-923-6086 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.