HomeMy WebLinkAbout0127246-Plumbing
e
OSHKOSH
ON THE WATER
Job Address 915 HUNTINGTON PL
CITY OF OSHKOSH
No
127246
PLUMBING PERMIT - APPLICATION AND RECORD
Shower
Floor Drain
1 Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
Owner MARK G/JETTA M SALZER Create Date 10/12/2007
Category 410 - Residential-Interior Plan
Water Softner Wait. St. Shamp Sink Coffee Maker
Local Waste Ice Chest FlrlWst Sink Int Grease Trap
Clothes Wshr Exam Sink Catch Basin Ext Grease Trap
Bidet Sculry Sink Wash Ftn RPZ Valve
Beer Tap Hand Sink Urinal Eye Wash Statn
Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs
Sterilizer Surgeons Sink Ice Maker Deduct Meters
Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs
Drink Ftn Serv Sink Soda Disp
Contractor DAVID R GLAZE, MP
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature
of Work
Valuation
Issued By
SFRI Remodel Kitchen & bathroom* The sinks will be replaced in the kitchen and bathroom.
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcel Id #
1311130000
$1,000.00 Plan Approval
$28.00 D Permit Voided I
$0,00 Permit Fees
Date 10/12/2007
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh h 0 authority to enforce easement restrictions of which it is not a party, if you perform the work
described in is pe Iicatio with' an easement, the City strongly urges the permit applicant to contact the
easement ho der( yes ary approv before starting such activity.
Signature
Date ><- \ f) \ \1--\D~
.
Agent/Owner
OSHKOSH
Address 915 HUNTINGTON PL
WI 54902 - 6236 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.