HomeMy WebLinkAbout0127245-Building
o
OSHKOSH
ON THE WATER
Job Address 915 HUNTINGTON PL
CITY OF OSHKOSH No 127245
BUILDING PERMIT - APPLICATION AND RECORD
Owner MARK G/JETTA M SALZER Create Date 10/12/2007
Designer
Contractor OWNER
Category
140 - Interior Remodeling Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement Sq. Ft.
Rooms
Height
Ft.
D Projection I
Finished/Living
Sq.Ft.
Bedrooms
Stories
Canopies
Signs
Garage
Sq. Ft.
Baths
Foundation
. Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier
o Treated Wood
o Other
Occupancy Permit
Occupancy Fee
$0.00 Flood Plain
Height Permit
# Dwelling Units
o
# Structures
o
Park Dedication
Use/Nature SFRI Remodel Kitchen* including replaCing cabinets and countertops. A non-load bearing wall will be removed between the kitchen and;
of Work ining room.
HV AC Contractor
Plumbing Contractor
DAVID R GLAZE, MP
Electric Contractor
Fees: Valuation
$10,000.00 Plan Approval
$0.00 Permit Fee Paid
$88.00 Park Dedication
$0.00
Issued By:
Of)
Date 10/12/2007 Final/O.P. 00/00/0000
D Permit Voided I
Parcel Id # 1311130000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has n uthority to enforce easement restrictions of which it is not a party, if you perform the work
described in this ermit ap tion wit' an sement, the City strongly urges the permit applicant to contact the easement
holder(s) and to ecu s before starting such activity.
Date
x vDh -z,lD :r
Address
Agent/Owner
OSHKOSH
~ 54902 - 6236 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.