Loading...
HomeMy WebLinkAbout0127180-Building (roof) e OSHKOSH ON THE WATER Job Address 861 PARK RIDGE AVE CITY OF OSHKOSH No 127180 BUILDING PERMIT - APPLICATION AND RECORD Owner JAMES/SHARON ENGLUND Create Date 10/10/2007 Designer Contractor CARPENTRY BY BOB Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq.Ft. Sq.Ft. Rooms Height Ft. o Projection I Finished/Living . Bedrooms Stories Canopies Garage Sq. Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature FRI LATE PERMIT/ Re-roof* tear off the existing roof and replace shingles. No structural work. of Work HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $7,800.00 Plan Approval $0.00 Permit Fee Paid $74.00 Park Dedication $0.00 Issued By: ~ Date 10/10/2007 Final/O.P. 00/00/0000 o Permit Voided I Parcelld # 1222450000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit ppli tion within an ease ent, the City strongly urges the permit applicant to contact the easement holder(s) and to se an ec s a 0 131 efore starting such activity. 11 Date 40-/6-0 '( Signature Address 5308 COUNTY ROAD R AgenVOwner OSHKOSH WI 54902 - 8504 Telephone Number 233-0870 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (I.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.