HomeMy WebLinkAbout0127167-Plumbing (water main/sewer)
e
OSHKOSH
ON THE WATER
Job Address 5-25 E WAUKAU AVE
CITY OF OSHKOSH No 127167
PLUMBING PERMIT - APPLICATION AND RECORD
Owner JAMES E LARSON Create Date 10/09/2007
Plan ZZ1-266-0907-P
Contractor 4 WAY CONSTRUCTION
Category 430 - Industrial-Exterior (laterals)
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature
of Work
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
Water Softner Wait. St. Shamp Sink
Local Waste Ice Chest FlrlWst Sink
Clothes Wshr Exam Sink Catch Basin
Bidet Sculry Sink Wash Ftn
Beer Tap Hand Sink Urinal
Lab Sink Plaster Sink Standp Rec
Sterilizer Surgeons Sink Ice Maker
Dip Well F Prep Sink Gar Drain
Drink Ftn Serv Sink Soda Disp
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
f4" private water main and 8" private interceptor main sewer for 5-6 unit apartment buildings per plan approval.
Size Material Type # Conn. Type
Sanitary Sewer 8" Plastic Main 1 New
Storm Sewer
Water Service 4" Plastic Main 1 New
Parcel Id #
Valuation
Issued By
$16,000.00
Plan Approval
$0.00
$100.00 D Permit Voided I
Date 10/09/2007
Permit Fees
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approval b 0 starting such activity.
Signature
Address P.O. BOX 133
WI 54923 - 0133 Telephone Number
Date
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
WARD:
Jq~
LOCATION: .5-- ;j~ E ~tov. ~4
. . n. ._ . ~
WORK DONE: l{'f tv1-' 1'1"\ ~/ ~ Se (l/ ,-(..{
~ r : tI~\{ L; ^-t 8 i' LU{rfctf rflu i (\ _
INV#: QTY: PARTS:
~l\ ~~r\? ~f~€~ lr tol\\r~k,r
\.. tlbtJr cy T Q. p-p i f\ J rf'O( hi (}-l.-
U en .d-e. u.:) .c.
y so -00
1S.OD
GRA VEL:- -
REMARKS: p'Cf['ilt+* dJD 7&
..\.. - - co
\D D ~:::k- uJ.& f ()
DATE: 10 r( 7 -07
DHL#:
TAP
CUT-IN Y
SIZE: '/ t,
CONTRACTOR:
~vr. &Ja(
MEASUREMENTS:
17/' ~~- %-J JvC-.e R.
(p I >~ /l/ fA JtJ'J~v' A~
PERMIT#:
BLACKDIRT: YEYESS ~NNO
CONCRETE: @9
DETAILS: -
WORKEjlS: C/L