HomeMy WebLinkAbout0127168-Plumbing (laterals)
e
OSHKOSH
ON THE WATER
Job Address 5 E WAUKAU AVE
CITY OF OSHKOSH No 127168
PLUMBING PERMIT - APPLICATION AND RECORD
Owner JAMES E LARSON Create Date 10/09/2007
Plan ZZ1-266-0907-P
Contractor 4 WAY CONSTRUCTION
Category 430 - Industrial-Exterior (laterals)
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature ~' water and 4" sanitary lateral to 6-unit apartment building per plan approval.
of Work
Shower Water Softner Wait. St. Shamp Sink
Floor Drain Local Waste Ice Chest Flr/Wst Sink
Lndry Tray Clothes Wshr Exam Sink Catch Basin
Disposal Bidet Sculry Sink Wash Ftn
Dishwasher Beer Tap Hand Sink Urinal
Sump Pump Lab Sink Plaster Sink Standp Rec
Classrm Sink Sterilizer Surgeons Sink Ice Maker
Breakrm Sink Dip Well F Prep Sink Gar Drain
Ejector/Grind Drink Ftn Serv Sink Soda Disp
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
I
Valuation
Size
Material
Plastic
Type
Lateral
#
Conn. Type
New
Sanitary Sewer
4"
Storm Sewer
Water Service
2"
Plastic
Lateral
New
$1,000.00
Plan Approval
$0.00
Permit Fees
$100.00 0 Permit Voided I
Issued By
Parcelld #
Date 10/09/2007
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to se e any necessary app Is efore starting such activity.
Signature
Address
P.O. BOX 133
D~ JY7
Telephone Number 920-361-1403
BERLIN
WI 54923 - 0133
To schedule inspections please call tile Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.