Loading...
HomeMy WebLinkAbout0127169-Plumbing (lateral) e OSHKOSH ON THE WATER Job Address 11 E WAUKAU AVE PLUMBING PERMIT - APPLICATION AND RECORD CITY OF OSHKOSH No 127169 Owner JAMES E LARSON Create Date 10/09/2007 Plan ZZ1-268-0907-P Contractor 4 WAY CONSTRUCTION Category 430 - Industrial-Exterior (laterals) Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature ~.. water and 4" sanitary lateral for 6-unit apartment per plan approval. of Work Shower Water Softner Wait. St. Shamp Sink Floor Drain Local Waste Ice Chest Flr/Wst Sink Lndry Tray Clothes Wshr Exam Sink Catch Basin Disposal Bidet Sculry Sink Wash Ftn Dishwasher Beer Tap Hand Sink Urinal Sump Pump Lab Sink Plaster Sink Standp Rec Classrm Sink Sterilizer Surgeons Sink Ice Maker Breakrm Sink Dip Well F Prep Sink Gar Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs i Size Conn. Type New Material Plastic Type Lateral # Sanitary Sewer 4" Storm Sewer Water Service 2" Plastic Lateral New Valuation $1,000.00 Plan Approval $0.00 Permit Fees $100.00 D Permit Voided I Issued By In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secu any necessary appr. Is fore starting such activity. Signature Date Agent/Owner Address P.O. BOX 133 BERLIN WI 54923 - 0133 Telephone Number 920-361-1403 Parcel Id # Date 10/09/2007 ::77 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.