HomeMy WebLinkAbout0127169-Plumbing (lateral)
e
OSHKOSH
ON THE WATER
Job Address 11 E WAUKAU AVE
PLUMBING PERMIT - APPLICATION AND RECORD
CITY OF OSHKOSH No 127169
Owner JAMES E LARSON Create Date 10/09/2007
Plan ZZ1-268-0907-P
Contractor 4 WAY CONSTRUCTION
Category 430 - Industrial-Exterior (laterals)
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature ~.. water and 4" sanitary lateral for 6-unit apartment per plan approval.
of Work
Shower Water Softner Wait. St. Shamp Sink
Floor Drain Local Waste Ice Chest Flr/Wst Sink
Lndry Tray Clothes Wshr Exam Sink Catch Basin
Disposal Bidet Sculry Sink Wash Ftn
Dishwasher Beer Tap Hand Sink Urinal
Sump Pump Lab Sink Plaster Sink Standp Rec
Classrm Sink Sterilizer Surgeons Sink Ice Maker
Breakrm Sink Dip Well F Prep Sink Gar Drain
Ejector/Grind Drink Ftn Serv Sink Soda Disp
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
i
Size
Conn. Type
New
Material
Plastic
Type
Lateral
#
Sanitary Sewer
4"
Storm Sewer
Water Service
2"
Plastic
Lateral
New
Valuation
$1,000.00
Plan Approval
$0.00
Permit Fees
$100.00 D Permit Voided I
Issued By
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secu any necessary appr. Is fore starting such activity.
Signature Date
Agent/Owner
Address P.O. BOX 133
BERLIN
WI 54923 - 0133 Telephone Number 920-361-1403
Parcel Id #
Date 10/09/2007
::77
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.