HomeMy WebLinkAbout2007-Plumbing (lateral)
o
OSHKOSH
ON THE WATER
Job Address 131151 WYLDEWOOD DR
CITY OF OSHKOSH
No 127154
PLUMBING PERMIT - APPLICATION AND RECORD
Owner WYLDEWOOD VILLAGE APARTMENTS LLC
Create Date 10/08/2007
Contractor 4 WAY CONSTRUCTION
Category 430 - Industrial-Exterior (laterals)
Plan ZZ2-276-1007-P
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature
of Work
Valuation
Issued By
Shower Water Softner Wait. St. Shamp Sink Coffee Maker
Floor Drain Local Waste Ice Chest FlrlWst Sink Int Grease Trap
Lndry Tray Clothes Wshr Exam Sink Catch Basin Ext Grease Trap
Disposal Bidet Sculry Sink Wash Ftn RPZ Valve
Dishwasher Beer Tap Hand Sink Urinal Eye Wash Statn
Sump Pump Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs
Classrm Sink Sterilizer Surgeons Sink Ice Maker Deduct Meters
Breakrm Sink Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs
Ejector/Grind Drink Ftn Serv Sink Soda Disp
INSTALL 2" WATER LATERAL FOR 8 UNIT RESIDENTIAL
Size Material Type # Conn. Type
Sanitary Sewer 4" Plastic Lateral 0 New
Storm Sewer
Water Service 2" Plastic Lateral 1 New
Parcelld #
$900.00 Plan Approval
$0.00 Permit Fees
$50.00 D Permit Voided I
Date 10/08/2007
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary ap al efore starting such activity.
Signature
Date
Address P.O. BOX
BERLIN
WI 54923 - 0133 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
. continue if the inspection is not performed within two business days from the time the project is ready.