Loading...
HomeMy WebLinkAboutPlumbing (ZZ2-274-1007-P) ~ OJHKOJH City of Oshkosh Inspection Services 215 Church Ave., PO Box 1130 Oshkosh, WI 54902-1130 (920) 236-5052 (920) 236-5184 FAX ON THE WATER October 5, 2007 Excel Engineering 100 Camelot Drive Fond du Lac, WI 54935 Ref: Plumbing Plan Approval: Alliance Development 410 S. Koeller St., Oshkosh, WI Plan 10# ZZ2-274-1007-P Dear Sirs, Examination of the plumbing plans and specifications for this project has been completed. In accord with Chapter 145, Wisconsin Statute, and COMM 81 through 85, Wisconsin Administrative Code, the plumbing plans and specifications are approved contingent upon compliance with the stipulation(s) noted below. 1. Storm drain horizontal roof leaders and building storm drain shall comply with requirements for horizontal GPM load per COMM 82.36 Table 82.36-1 In the event installation of this plumbing system has not commenced within two years from this date, this approval shall become void. A new application accompanied by full examination fees shall be filed and an updated approval received before work may commence. In granting this approval, the City of Oshkosh or its representative does not hold itself liable for any defects in plans or specifications, plan omissions, examination oversight, construction or any damage that may result in or after installation. The City of Oshkosh reserves the right to order changes or additions should conditions arise making this necessary. It shall be necessary for the installing plumber to obtain a plumbing permit from the City of Oshkosh before proceeding with actual installation of this plumbing system or any of its parts. Respectfu lIy, Richard Wood, Plumbing Inspector