HomeMy WebLinkAbout0127098-Building
"
o
OSHKOSH
ON THE WATER
Job Address 1329 W SOUTH PARK AVE
CITY OF OSHKOSH
No
127098
BUILDING PERMIT - APPLICATION AND RECORD
Owner ROBERT A/L1SA A CONVERY
Create Date 09/26/2007
Designer
Contractor PAULY CONSTRUCTION
Category
111 - Single Family Addition
Plan 45- )~\) ~
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement
Sq.Ft.
Sq.Ft.
Rooms
Height
Ft.
D Projection I
Finished/Living
Bedrooms
Stories
Canopies
Garage
Sq.Ft.
Baths
Signs
Foundation
. Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier
o Treated Wood
o Other
Occupancy Permit Not Required
Occupancy Fee
$0.00 Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
o
Use/Nature SFRtRazingthe-e,<!sting deta-ched garage and constructing an attached garage and breezeway. All construction shall comply with loca:
of Work nd state building code requirements.
HV AC Contractor
OWNER
Plumbing Contractor OWNER
Electric Contractor HOMEOWNER
Fees: Valuation
Issued By: WA.--
$85,000.00 Plan Approval
$75.00 Permit Fee Paid
$313.00 Park Dedication
$0.00
Date 10/04/2007
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 1307240000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secur any necessary appr als befor starting such activity.
Signature
Date~~f ZQ:)
Address 135 HORSESHOE LN
WI 54935 -0000 Telephone Number 979-5569
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.