Loading...
HomeMy WebLinkAbout0127098-Building " o OSHKOSH ON THE WATER Job Address 1329 W SOUTH PARK AVE CITY OF OSHKOSH No 127098 BUILDING PERMIT - APPLICATION AND RECORD Owner ROBERT A/L1SA A CONVERY Create Date 09/26/2007 Designer Contractor PAULY CONSTRUCTION Category 111 - Single Family Addition Plan 45- )~\) ~ Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq.Ft. Sq.Ft. Rooms Height Ft. D Projection I Finished/Living Bedrooms Stories Canopies Garage Sq.Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature SFRtRazingthe-e,<!sting deta-ched garage and constructing an attached garage and breezeway. All construction shall comply with loca: of Work nd state building code requirements. HV AC Contractor OWNER Plumbing Contractor OWNER Electric Contractor HOMEOWNER Fees: Valuation Issued By: WA.-- $85,000.00 Plan Approval $75.00 Permit Fee Paid $313.00 Park Dedication $0.00 Date 10/04/2007 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1307240000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secur any necessary appr als befor starting such activity. Signature Date~~f ZQ:) Address 135 HORSESHOE LN WI 54935 -0000 Telephone Number 979-5569 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.